My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-15_GENERAL DOCUMENTS - C1981008 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981008
>
2023-02-15_GENERAL DOCUMENTS - C1981008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 7:44:32 AM
Creation date
2/22/2023 7:34:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
General Documents
Doc Date
2/15/2023
Doc Name Note
Revised Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Type & Sequence
SL25
Permit Index Doc Type
Findings
Email Name
CCW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Borehole Worksheet Cont'd Task#TTT Page 7 of 12 <br /> SCRAPER TEAM WORK <br /> Task description: Replace topsoil on 3.6 ac parcels DP10,DP12 &DP13 <br /> Site: New Horizon Mine Permit Action: SL25 Permit/Job#: C1981008 <br /> PROJECT IDENTIFICATION <br /> Task#: 30D State: Colorado Abbreviation: None <br /> Date: 11/30/2022 County: Montrose Filename: C008-30D <br /> User: JHB <br /> Agency or organization name: Colorado Division of Reclamation,Mining and Safety <br /> HOURLY EQUIPMENT COSTShiftbasis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 631G <br /> -Dozer: Cat D9T-9SU <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker, 5,000 Gal. <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 100 NA NA 50 h <br /> Ownership cost/hour: $200.41 $146.30 NA NA $114.80 $37. <br /> Operating cost/hour: $194.76 $141.41 NA NA $39.70 $5L'. <br /> %Utilization-ripper: NA NA NA NA NA N <br /> Ripper own. cost/hour: NA $0.00 NA NA $0.00 $0.1 <br /> Ripper op. cost/hour: NA $0.00 NA NA $0.00 $0.1 <br /> Operator cost/hour: $30.90 $41.30 NA NA $28.56 $0.1 <br /> Unit Subtotals: $426.07 $329.01 NA NA $183.05 $88.1 <br /> Number of Units: 4 2 0 0 1 <br /> Group Subtotals: Work: $2,362.30 Support: $0.00 Maint: $271.54 <br /> Total work team cost/hour: $2,633.84 <br /> MATERIAL QUANTITIES <br /> Initial volume: 5,808 CCY Swell factor: 1.100 <br /> Loose volume: 6,389 LCY <br /> Source of estimated volume: Map 2.05.4-9,21"Mixed <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,100 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: User Provided Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 38.86 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.