My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-16_REVISION - C1981008 (7)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2023-02-16_REVISION - C1981008 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:10:56 PM
Creation date
2/16/2023 1:09:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
2/16/2023
Doc Name
Notice of Proposed Decision
From
DRMS
To
Office of Surface Mining
Type & Sequence
SL25
Email Name
CCW
THM
Media Type
D
Archive
No
Supplemental fields
Permit Order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1313 Sherman St. Room 215 Denver, CO 80203 P (303) 866-3567 F (303) 832-8106 https://drms.colorado.gov <br />Jared Polis, Governor | Dan Gibbs, Executive Director | Virginia Brannon, Director <br />February 16, 2023 <br /> <br />Howard Strand <br />Office of Surface Mining <br />Western Region <br />One Federal Center, Building 41 <br />PO Box 25065 <br />Denver, CO 80225 <br /> <br /> <br />Re: New Horizon Mine (Permit No. C-1981-008) <br /> Bond Release Application No. 25 (SL-25) <br /> <br /> <br />Dear Mr. Strand: <br /> <br />The Colorado Division of Reclamation, Mining and Safety has issued a proposed decision to <br />approve Bond Release Application No. 25 at the New Horizon Mine. This decision will become <br />final at the close of the thirty (30) day public comment period, which commences the day following <br />the initial publication in the San Miguel Basin Forum. A copy of the proposed decision and written <br />findings is enclosed. <br /> <br />The Division proposes to approve Phase I bond release on 2.7 acres of dryland pasture located in <br />the southeast quarter of Section 6 (topsoil stockpile E footprint). The Division proposes to approve <br />Phase I bond release on 1.9 acres located in the southeast quarter of Section 36 that have been <br />reclaimed to permanent stock pond SP2. And the Division proposes to approve Phase I bond <br />release on 16.3 acres of irrigated pasture and 3.6 acres of dryland pasture (Parcels DP-10, DP-12, <br />and DP-13) located in south east quarter of Section 36. <br />The Division proposes to approve Phase II bond release on 11.4 acres of reclaimed pasture. 2.9 <br />acres have been reclaimed as Irrigated pasture, parcel IP-10. A portion of this parcel requires <br />minor adjustment to correct an area of differential settling and the formation of a small gully. The <br />Division proposes to approve 3.6 acres of dryland pasture (Parcels DP-10, DP-12, and DP-13) <br />located in south east quarter of Section 36. And the Division proposes to approve Phase II bond <br />release on 4.9 acres of dryland pasture, parcels DP-16 and DP-17, located in the southeast quarter <br />of Section 6. The Division proposes to approve to release the applicant from liability for: all <br />reclamation work on eleven reclaimed monitoring wells. The Divison entered 0.001 acres into the <br />Phase III release catagory to allow the permit system to display that Phase III release was approved <br />for the wells. Eventhough the wells had no acreages associated with them in the application due <br />to their negligible footprint. Specifically wells GW-N41, GW-N42, GW-N43, GW-N16P1, GW- <br />17P1, GW-N19P1, MFBF-71, MW BF-63, GW-N-40, GW-N39, and GW-N3. As provided by
The URL can be used to link to this page
Your browser does not support the video tag.