Laserfiche WebLink
Minor Decision <br /> Revisions Descriptions Submitted Decision Date <br /> MR30 Permit Midterm Responses 4/30/2018 Approved 5/18/2018 <br /> MR31 Wetlands Enhancements 4/9/2019 Approved 7/10/2019 <br /> MR32 Temporary Paint and <br /> Sandblast Tents 11/19/2019 Approved 11/25/2019 <br /> Technical <br /> Revisions <br /> TRIO Midterm Review Responses 4/24/2018 Terminated 4/30/2018 <br /> Permit <br /> Renewals <br /> RN2 Permit Renewal 2 2/19/2020 Approved 8/20/2020 <br /> Section III - Status of Stipulations <br /> The stipulation history for the Peabody Sage Creek Mine was reviewed as part of the midterm review. <br /> The review included an investigation of any stipulations imposed since the last permit renewal, and any <br /> responses to existing stipulations received since the last permit renewal. There were no stipulations <br /> placed upon the original Peabody Sage Creek Mine permit, and none have been imposed since. <br /> Section IV—Permit Variances and Specific Approvals <br /> The Sage Creek Mine permit does not include a variance under Rules 2.06.2 (experimental practices), <br /> 2.06.3 (mountaintop removal), and 2. 06. 5 (approximate original contour(AOC) for steep slope <br /> mining). No variance from contemporaneous reclamation for combined surface and underground mining <br /> operations (2.06.7) is needed due to the Seneca II Mine ceased operations in 1999 and has been <br /> reclaimed, the excavated pit accessing the Wadge Seam to construct mine portals and other facilities to <br /> support an underground mine is not considered surface mining, and the Peabody Sage Creek Mine <br /> reclamation bond includes any remaining facilities from the Seneca II Mine. <br /> Section V - Enforcement Actions <br /> No enforcement actions were issued by DRMS since the last renewal. <br /> Op COl0 <br /> e <br /> 1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 I `�' O <br /> �`1876� <br />