Laserfiche WebLink
1 J&T Consulting, Inc. Loloff Construction <br /> Loloff Mine <br /> 2/14/2023 <br /> Reclamation Bond Quantities and Costs Bond Calc for TR4 <br /> ©2023 J&T Consulting,Inc. <br /> Reclamation Completed <br /> ec ama ion Operation Quantity Unit UnitCost Cost <br /> Active Mining Area(55.17 acres-46.0 Acres Reservoir, 5.13 acres Hard Surfacing, 3.17 acres Access Road, and 0.87 acres Undisturbed) <br /> Grading Ground in Disturbed Area - Includes Hard Surfacing and Access <br /> Roads 8.30 ac $ - $ - <br /> Hard Surfacing Placement/Compaction in Disturbed Area 5.13 ac $ - $ - <br /> Road Base Placement/Compaction for Access Road 3.17 ac $ - $ - <br /> Mobilization - Is $ - $ - <br /> Total Direct Cost $ - <br /> Overhead and Profit Cost (12.60%) $ - <br /> Contract Cost - <br /> Project Management (9.25%) $ - <br /> Total Required Financial Warranty for Reclamation $ <br /> Weed Control and Maintenance of Slopes to be performed by Land Owner Owner- Ogilvy Irrigating and Land Company <br /> 1 of 1 <br />