My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-14_REVISION - M1985112 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985112
>
2023-02-14_REVISION - M1985112 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2023 2:12:33 PM
Creation date
2/14/2023 2:09:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985112
IBM Index Class Name
Revision
Doc Date
2/14/2023
Doc Name
Adequacy Review Response #2
From
J&T Consulting, Inc./Loloff Construction, Inc.
To
DRMS
Type & Sequence
TR4
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1AJ&T Consulting, Inc. <br /> February 14, 2023 <br /> Mr. Rob Zuber <br /> Environmental Protection Specialist <br /> State of Colorado <br /> Division of Reclamation, Mining, and Safety <br /> Physical Address: <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> Mailing Address: <br /> Division of Reclamation, Mining and Safety, Room 215 <br /> 1001 East 62nd Avenue <br /> Denver, CO 80216 <br /> RE: Loloff Construction, Inc. —Loloff Pit— Technical Revision No. 4 2nd Adequacy Review Response <br /> File No. M-1985-112 <br /> Dear Mr. Zuber, <br /> Loloff Construction, Inc has received the Division's 2nd Adequacy Review of Technical Revision No. 4 <br /> letter dated February 14, 2023. Below are the comments and the corresponding responses that we <br /> have provided to address the adequacy review comments. <br /> 1. Exhibit E needs to be updated to describe the new reclamation plan. <br /> • No further response required <br /> 2. On the Reclamation Plan Map (Exhibit F), please indicate the status and plan for the blank <br /> area in the northwest corner. Is this area undisturbed by mining activity? Or will this area be <br /> hard surface? <br /> • No further response required <br /> 3. On Exhibit F, indicate what work is complete and what work will be completed in the future. <br /> This can be done using notes or a text box. <br /> • No further response required <br /> 4. Regarding the notes on Exhibit F, please explain if the verb tense is accurate. For example, <br /> they state that soils "will be" placed and fill "will be" compacted. As appropriate, revise the <br /> text in the notes to state what has already been completed. <br /> • No further response required <br /> 5. Exhibit L must be updated to show the remaining reclamation tasks. If all work has been <br /> completed, state that in the text. A task for maintenance of the site, including repair of rills <br /> on the slopes, should be included. <br /> • This adequacy item was not resolved. Please provide updated Exhibit L to describe <br /> the current costs, even if there are none. <br /> Response: All work has been completed. The updated Exhibit L is attached. <br /> Loloff Construction, Inc. appreciates your consideration of our responses to your comments. <br /> V M 305 Denver Avenue—Suite D• Fort Lupton CO 80621 • Ph: 303-857-6222 <br />
The URL can be used to link to this page
Your browser does not support the video tag.