Laserfiche WebLink
FORM OF PROPOSAL <br /> Name of Bidder: Hall-Irwin,Corporation Phone: 970-587-7299 <br /> Address: 5586 W 19th Street#2000 Greeley 80634 <br /> It is understood by all Bidders that the Owner reserves the right to eliminate or reject any and all bids. <br /> Owner will pay as indicated on the Proposal on a Unit Costs basis for all items in this contract. Quantities and unit costs will be used to <br /> determine pay amounts for Change Orders. <br /> The Contractor shall perform the Work described in these Contract Documents in accordance with the following Unit Price. Overheads, <br /> profits,fuel surcharges,and all other non-direct costs shall be included in the Unit Price and will not be paid as separate items. <br /> Contract Price Morton Lakes Stage 7B-Slurry Wall <br /> Construction Item Quantity Unit Unit Extended <br /> Price Cost <br /> 1 Mob/Demob 1 LS $ 79,083.02 $ 79 083.02 <br /> 2 Slurry Wall Design include Sloe Stability Analysis 1 LS $ 88,816.31 $ 88 816.31 <br /> 3 Review and Update Flood Control Plan N/A N/A <br /> 4 Clearing and Grubbing tree removal&shredding) N/A N/A <br /> 5 Platform Construction 5000 CY $ 7.73 $ 38,650.60 <br /> Supplemental Fines(assumes on-site borrow& <br /> 6 100%cast out on supplemental fines) 18156 CY $ 5.90 $ 107 120.40 <br /> 7 Construction of Slurry Wall 163404 SF $ 5.85 $ 955,913.40 <br /> 8 Liner Leak Test 1 LS $ 26.158.23 $ 26 158.23 <br /> 9 Project Management 1 LS $ 78,389.88 $ 78 389.88 <br /> 10 Site Restoration 1 LS $ 11,923.29 $ 11,923.29 <br /> 11 ISlurry Wall Crossings 3 Ea $ 7,299.97 1 $ 21,899.91 <br /> 12 1 Other-Dewatering for leak test 1 LS $ 79,083.02 1 $ 79 083.02 <br /> Total Construction Items $ 1,487,037.46 <br /> Each bid proposal shall include a project schedule. <br /> Each bid proposal shall include a completed"Subcontractor/Supplier List"form <br /> Notes <br /> NOTES: <br /> 1) This proposal assumes a maximum 4 foot key into claystone and or clay per bore logs. <br /> 2)Assumes no cement is required with the slurry mix <br /> 3) This proposal assumes a 1 %Dry Bentonite Mix. <br /> 4) Assumes PC-800 Excavator can be utilized <br /> 5) Import fines material assumed to be found in the overburden material <br /> 6) Depth to bedrock is assumed to be between 28 ft and 45 ft and no farther than 45 ft <br /> 7) Quantity for slurry wall square footage is per the provided information and includes 4'key <br /> 8) Quantity will be paid on final design and constructed quantities <br /> 9) Clear and Grub is assumed by others per addendum <br />