Laserfiche WebLink
1AJ&T Consulting, Inc. <br /> February 10, 2023 <br /> Mr. Rob Zuber <br /> Environmental Protection Specialist <br /> State of Colorado <br /> Division of Reclamation, Mining, and Safety <br /> Physical Address: <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> Mailing Address: <br /> Division of Reclamation, Mining and Safety, Room 215 <br /> 1001 East 62nd Avenue <br /> Denver, CO 80216 <br /> RE: Loloff Construction, Inc. —Loloff Pit— Technical Revision No. 4 Adequacy Review Response <br /> File No. M-1985-112 <br /> Dear Mr. Zuber, <br /> Loloff Construction, Inc has received the Division's Preliminary Adequacy Review of Technical Revision <br /> No. 4 letter dated February 1, 2023. Below are the comments and the corresponding responses that we <br /> have provided to address the adequacy review comments. <br /> 1. Exhibit E needs to be updated to describe the new reclamation plan. <br /> Response: The updated Exhibit E is attached with descriptions of the new <br /> reclamation plan. <br /> 2. On the Reclamation Plan Map (Exhibit F), please indicate the status and plan for the blank <br /> area in the northwest corner. Is this area undisturbed by mining activity? Or will this area be <br /> hard surface? <br /> Response: The area is undisturbed by mining so no reclamation is needed at the <br /> location. This is the area of the existing ditch that runs from the north side of the <br /> property to the west side and then south before exiting the property. <br /> 3. On Exhibit F, indicate what work is complete and what work will be completed in the future. <br /> This can be done using notes or a text box. <br /> Response: All work has been completed for the mine reclamation. The updated <br /> Exhibit F map is attached with notes and changes for Item number 4, as well. <br /> 4. Regarding the notes on Exhibit F, please explain if the verb tense is accurate. For example, <br /> they state that soils "will be" placed and fill "will be" compacted. As appropriate, revise the <br /> text in the notes to state what has already been completed. <br /> Response: The updated Exhibit F is attached with the updated text stating that the <br /> tasks are completed. <br /> 5. Exhibit L must be updated to show the remaining reclamation tasks. If all work has been <br /> completed, state that in the text. A task for maintenance of the site, including repair of rills <br /> on the slopes, should be included. <br /> Response: All work has been completed. The next step will be submitting a release of <br /> the current financial warranty of$244,389.00. The Ogilvy Irrigating and Land Company <br /> owns the reclaimed water storage reservoir and will maintain the site including the <br /> V M 305 Denver Avenue—Suite D• Fort Lupton CO 80621 • Ph: 303-857-6222 <br />