My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-10_PERMIT FILE - P2023003
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2023003
>
2023-02-10_PERMIT FILE - P2023003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2023 6:16:16 PM
Creation date
2/13/2023 8:20:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2023003
IBM Index Class Name
Permit File
Doc Date
2/10/2023
Doc Name
Notice Of Intent
From
AuPt Industries LLC
To
DRMS
Email Name
ZTT
AME
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> Topsoil is approximately 10 inches in depth. Topsoil on affected areas will be stockpiled <br /> and saved for reclamation. Topsoil will be used to cap reclaimed sand. Redistribution <br /> depth will be the same depth as the topsoil removed, approximately 10 inches. <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> N/A <br /> 5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> Topsoil from all exploration test pits will be stock piled adjacent to the disturbance. <br /> Topsoil will be used to cap reclaimed excavation. If the material removed from the hole <br /> during drilling are inadequate to backfill the drill hole, sand from tailings at the AuPt's <br /> existing Permit M2016081 will be used. Disturbance will be seeded and imprinted in <br /> October. <br /> 1 orm 2 1,111111" I-ihc Page 9 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.