Laserfiche WebLink
E. Other Disturbances (please describe) <br /> Test pits will extend to between 15'-20' below the ground surface Topsoil will be removed and stockpiled next to the <br /> disturbance.The test pits will be logged and sampled and immediately backfilled before moving to the next location. <br /> Stockpiled topsoil will be reapplied to disturbance. Disturbance will be seeded and imprinted in October.We are estimating <br /> that the test pits will be 15-20' in depth,width,and length plus the area necessary to temporarily store the excavated material <br /> with a maximum footprint of 1600 square foot per disturbance.A maximum of 20 tons will be collected and moved offsite for <br /> full mineral aralysis <br /> F. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to <br /> store. <br /> Diesel, Lubricants etc. Items are double contained and are approved with the West Side <br /> Placer 110-2 permit #M2016081. <br /> G. New Roads: <br /> Length (ft): Width (ft): <br /> Significantly <br /> Upgraded Roads Length (ft): Width (ft): <br /> Are culverts or other crossings proposed"? If so, please describe: <br /> N/A <br /> 11. Total project area to be disturbed (acres) 2 <br /> I. Describe the equipment to be used for the prospecting operations: <br /> Cat 330 Excavator <br /> Fol'I»2 PnLli�' 1 1;1" Page 7 of 14 <br />