Laserfiche WebLink
February 6,2023 C-1983-059/Terror Creek Loadout LDS <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection N -Roads <br /> R -Availability of Records N -Reclamation Success <br /> N -Backfill&Grading N -Revegetation <br /> N -Excess Spoil and Dev. Waste N - Subsidence <br /> N -Explosives N - Slides and Other Damage <br /> N -Fish&Wildlife N - Support Facilities On-site <br /> N -Hydrologic Balance Y - Signs and Markers <br /> R -Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N -Other N - Special Categories Of Mining <br /> N -Processing Waste N -Topsoil <br /> COMMENTS <br /> This was a complete inspection by Leigh Simmons of the Division of Reclamation,Mining and Safety(Division). <br /> The weather was clear,with snow on the ground.There was no activity at the site, and no sign of any recent <br /> disturbance. <br /> AVAILABILITY OF RECORDS—Rule 5.02.4(l): <br /> Records were available at the Elk Creek mine office.Details are given at the end of this report. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> There was no sign of anyone having accessed the site recently,or any other changes at the site.The sign <br /> was in place and the site was secure behind a locked gate. <br /> DOCUMENTS RECEIVED <br /> N/A <br /> OTHER(SPECIFY) <br /> N/A <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 5 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 2 of 4 <br />