Laserfiche WebLink
CIRCES Cost estimate MT6 Yoast Mine Page 13 <br /> SCRAPER TEAM WORK <br /> Task description: Replace Topsoil from Stockpile L to Unreleased Pond 12 Area <br /> Site: Yoast Mine Permit Action: MT6 Permit/Job#: C1994082 <br /> PROJECT IDENTIFICATION <br /> Task#: 046 State: Colorado Abbreviation: None <br /> Date: 12/19/2022 County: Routt Filename: 1994082 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShiftbasis: I per day <br /> Equipment Description <br /> -Scraper: Cat 637G w/push-pull <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker, 10,000 Gal. <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA NA 25 25 <br /> Ownership cost/hour: $287.19 NA NA NA $114.80 $91.73 <br /> Operating cost/hour: $277.83 NA NA NA $19.85 $32.57 <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own. cost/hour: NA NA NA NA $0.00 $0.00 <br /> Ripper op. cost/hour: NA NA NA NA $0.00 $0.00 <br /> Operator cost/hour: $30.90 NA NA NA $28.56 $21.12 <br /> Unit Subtotals: $595.92 NA NA NA $163.20 $145.42 <br /> Number of Units: 4 0 0 0 1 1 <br /> Group Subtotals: Work: $2,383.68 Support: $0.00 Maine $308.62 <br /> Total work team cost/hour: $2,692.30 <br /> MATERIAL QUANTITIES <br /> Initial volume: 127,255 CCY Swell factor: 1.115 <br /> Loose volume: 141,889 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,100 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Earth-Loam Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 38.86 LCY Adjusted Capacity: 29.00 LCY <br /> December 2022 <br />