My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-02_GENERAL DOCUMENTS - C1994082
>
Day Forward
>
General Documents
>
Coal
>
C1994082
>
2023-02-02_GENERAL DOCUMENTS - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2023 11:52:27 AM
Creation date
2/7/2023 6:23:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
General Documents
Doc Date
2/2/2023
Doc Name Note
Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Seneca Property LLC
Type & Sequence
MT6
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: <br /> Site: Yoast Mine Permit Action: MT6 Permit/Job#: C1994082 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 12/19/2022 County: Routt Filename: C082-000 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Herbicide Plateau Remains REVEGE 1 100.00 $22,179 <br /> 031 Regrade Pond 011 DOZER 1 30.20 $10,518 <br /> 032 Regrade Pond 012 DOZER 1 96.23 $33,511 <br /> 035 Reconstruct Drainage Channels POSTMININ 1 92.44 $31,488 <br /> G <br /> 037 Regrade Pond 12A DOZER 1 44.72 $15,573 <br /> 046 Replace Topsoil from Stockpile L to Unreleased SCRAPERI 2 73.72 $198,482 <br /> Pond 12 Area <br /> 065 Drill Seed Mix 1 REVEGE 1 173.90 $5,546 <br /> 066 Drill Seed mix 2 REVEGE 1 19.00 $13,454 <br /> 068 Broadcast Seed Mix 1 REVEGE 1 13.00 $18,217 <br /> 070 Shrub/Tree Planting-List 1 -Areas NOT Released REVEGE 1 20.00 $59,876 <br /> 074 Drill Seed Mix 1 -Reseed Phase II Areas-100%of REVEGE 1 252.30 $9,588 <br /> 19.85 Acre <br /> 085 Mobilize/Demobilize Equipment for Initial MOBILIZE 1 3.33 $12,695 <br /> Reclamation <br /> 086 Mobilize/Demobilize Equipment for Pond MOBILIZE 1 3.33 $2,946 <br /> Removal <br /> 087 Mobilize/Demobilize Equipment for Site MOBILIZE 1 11.33 $58,933 <br /> Maintenance <br /> SUBTOTALS: 933.5 $493,006 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $9,959 <br /> Performance bond: 1.05 Total= $5,177 <br /> Job superintendent: 407.75 Total= $30,634 <br /> Profit: 10.00 Total= $49,301 <br /> TOTAL O&P= $95,070 <br /> CONTRACT AMOUNT(direct+0&P)= $588,076 <br />
The URL can be used to link to this page
Your browser does not support the video tag.