Laserfiche WebLink
CIRCES Cost estimate MT6 Yoast Mine Page 11 <br /> HOURLY PRODUCTION <br /> Average push distance: 175 feet <br /> Unadjusted hourly 805.3 LCY/hr <br /> production: <br /> Materials consistency Compacted fill or embankment 0.9 <br /> description: <br /> Average push 5% <br /> gradient: <br /> Average site altitude: 7,400 feet <br /> Material weight: 2,9001bs/LCY <br /> Weight description: Decomposed rock-50%Rock, 50%Earth <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 0.900 (CAT HB)) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (FND-RF) <br /> Push gradient: 0.903 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.793 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.3209 <br /> Adjusted unit 258.42 LCY/hr <br /> production: <br /> Adjusted fleet 258.42 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $1.348/LCY <br /> Total job time: 44.72 Hours <br /> Total job cost: $15,573 <br /> December 2022 <br />