Laserfiche WebLink
Loader Worksheet Cont'd Task#035 Page 2 of 2 <br /> Totals: <br /> Geotextile(SY): $26,541.59 <br /> Riprap(CY): $0.00 <br /> Excavation(CY): $4,946.26 <br /> Hours: <br /> Geotextile(SY): 66.52 <br /> 87.50 SY/HR <br /> Riprap(CY): 0.00 <br /> 7.75 CY/HR <br /> Excavation(CY): 25.92 <br /> 40.00 CY/HR <br /> Total Post-Mining Channel Reconstruction hours: 92.44 Hours <br /> Total Post-Mining Channel Reconstruction Cost: $31,488 <br />