Laserfiche WebLink
CIRCES Cost estimate MT6 Yoast Mine Page 7 <br /> BULLDOZER WORK <br /> Task description: Regrade Pond 012 <br /> Site: Yoast Mine Permit Action: MT6 Permit/Job#: C1994082 <br /> PROJECT IDENTIFICATION <br /> Task#: 032 State: Colorado Abbreviation: None <br /> Date: 12/16/2022 County: Routt Filename: 1994082 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D9T-9SU <br /> Horsepower: 405 <br /> Blade Type: Semi-Universal <br /> Attachment 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $146.30 NA <br /> Operating Cost/Hour: $141.41 100 <br /> Ripper own. $17.01 NA <br /> Cost/Hour: <br /> Ripper op. Cost/Hour: $2.21 25 <br /> Operator Cost/Hour: $41.30 NA <br /> Total unit Cost/Hour: $348.23 <br /> Total Fleet Cost/Hour: $348.23 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 26,729 <br /> Swell factor: 1.165 <br /> Loose volume: 31,139 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> December 2022 <br />