The Division has reviewed all topsoil tasks previously approved as well as Trapper's rational and agree <br /> that topsoil swell should be consistent between all tasks.All topsoil swell has been reviewed and adjusted <br /> as necessary by changing material volume units from CCY to LCY. <br /> ■ Trapper:As noted above, Trapper also found inconsistencies in the application of equipment type <br /> and fleet size in relation to our estimate. In some cases, equipment types were not consistent <br /> within like categories of bonding tasks. Trapper would prefer fleet type and sizing be applied in <br /> a similar fashion to the App.A bond estimate to make comparisons of the two estimates easier. <br /> In this case Trapper would prefer the CAT DI I T-11 U be used for dozer backfill tasks; the <br /> Komatsu 830E/CAT 6090 fleet for backfill; the CAT 777F/CAT 385C L fleet for topsoil haulage; <br /> the CAT 637G/CAT DIO fleet for scraper work;smaller dozers are acceptable for other <br /> miscellaneous tasks. <br /> Fleets,support equipment and associated%utilization have been reviewed and corrected across the entire <br /> Division's RCE that is consistent with similar tasks and Trapper's provided Tables. <br /> ■ Trapper: Trapper also noted on all seeding/revegetation tasks that a chisel plowing cost is <br /> associated with these activities. This is not a common practice on the site and it would most <br /> likely not be conducted. Trapper asks if this costs could be removed from all seeding tasks as it <br /> seems unnecessary. <br /> The Division has reviewed all Revegetation tasks in comparison to previously approved RCE's and the <br /> approved Trapper PAP and has updated tasks for consistency as necessary. <br /> ■ Trapper: <br /> Specific Task Edits: <br /> Task 043, Regrade Explosive Storage Access Road,- This is an erroneous task, there is no such <br /> feature located on the mine site at this time. This task may have applied to a prior feature of this <br /> description, it should be removed. <br /> At Trapper's request Task 043 has been removed as this task was never built or a part of Trapper's <br /> approved PAP. <br /> Task 055, Regrade Middle Flume Access Roads (1, 2, and 3); Middle Flume#2 was never <br /> constructed, and is not planned to be in the future. Trapper did not calculate reclamation tasks <br /> for this part of the road in App A, Table A-6.2. This task could be edited to reduce total yards <br /> from 19,830 to 10,539. Robin Reilley Page 4 of 6 January 2023 <br /> At Trapper's request Task 055 has been adjusted as part of this task was never built and is no longer a <br /> part of Trapper's approved PAP.Volumes have been reduced from 19,830 to 10,539. See Task 055. <br /> Task 059,Jeff vay Access Road,-An "access road"was not constructed into the Jeffway Pond, <br /> only a preexisting light use road exists. This task could be removed to reflect actual site <br /> conditions. Regrade of a developed road will not be required. <br /> Trapper Mine RCE Memo February 3,2022 <br />