My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-03_REVISION - C1981010 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2023-02-03_REVISION - C1981010 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2023 6:18:31 PM
Creation date
2/7/2023 4:38:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
2/3/2023
Doc Name
Adequacy Review
From
Zach Trujillo
To
Robin Reilley
Type & Sequence
PR11
Email Name
RAR
JLE
AME
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 4 <br /> Appendix 2 -Ta1Pac- CIRCES Comparison <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Test-Regrade L Pit See 401,700 <br /> Site: Trapper Mine Permit Action: Testl 1 Permit/Job#: C1981010 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 1/31/2023 County: Moffat Filename: COIO-000 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: KOMATSU 830E <br /> -Loader: CAT 6090 <br /> Support Equipment-Load Area: Cat D10T- IOSU <br /> -Dump Area: Cat D10T- IOSU <br /> Road Maintenance-Motor Grader: CAT 16M <br /> -Water Truck: Water Tanker,2,500 Gal. <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Shovel Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 100 25 25 25 50 <br /> Ownership cost/hour: $179.05 $23.07 $153.67 $153.67 $163.86 $10.28 <br /> Operating cost/hour: $247.93 $930.15 $41.74 $41.74 $27.47 $10.16 <br /> %Utilization-riper: NA 0 15 NA NA NA <br /> Ripper own.cost/hour: NA $0.00 $24.69 $0.00 $0.00 $0.00 <br /> Ripper op.cost/hour: NA $0.00 $1.81 $0.00 $0.00 $0.00 <br /> Operator cost/hour: $34.42 $37.32 $41.30 $41.30 $28.56 $27.68 <br /> Unit Subtotals: $461.40 $990.54 $238.52 $236.71 $219.88 $48.12 <br /> Number of Units: 3 1 1 1 1 1 <br /> Group Subtotals: Work: $2,374.74 Support: $475.23 Maint: $268.00 <br /> Total work team cost/hour: $3,117.97 <br /> MATERIAL QUANTITIES <br /> Initial volume: 628,074 CCY Swell factor: 1.000 <br /> Loose volume: 628,074 LCY <br /> Source of estimated volume: TR124 Appendix A Table A-3.1 <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity <br /> Truck Payload(weight)Basis: <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.