Laserfiche WebLink
-4- <br /> 12. Primary future Post-minim land use check one): <br /> Li Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> R] Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary resent land use check one : <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Material will be extracted using front end loaders. <br /> 15. On Site Processing: PI' Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> Excitation will be performed by front end loaders which will remove and haul the raw resource to a processing plod and will deposit the material In a surge pile A front end loader wil deposit the material <br /> from the surge pile into the mrahtrp and screening plant, <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> No designated chemicals or acid-producing materials will be used or stored within the permit area <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> This conversion application is requesting to take the original permit M2003-002 (9.9 acres)and <br /> add in the additional disturbed acreage outside the original permit boundary. This would create <br />