My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-03_REVISION - M1984094
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984094
>
2023-02-03_REVISION - M1984094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2023 8:37:21 PM
Creation date
2/7/2023 9:29:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984094
IBM Index Class Name
Revision
Doc Date
2/3/2023
Doc Name
Request For Succession Of Operator
From
South Park Aggregates, LLC
To
DRMS
Type & Sequence
SO5
Email Name
ERR
MAC
SMS
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Excavated Pit Slope Inspection Plan <br /> For the steeper mine slopes of 33.7 degrees,the operator must do the following: <br /> 1)Constantly observe(daily)for any sign of instability, including visual cracks,slips, dribbling of <br /> material,mud zones, gravel zones without cementing fines, slips, or any other signs of instability. <br /> If any are found,the operator must either lessen the slope to eliminate the visual problem or call a <br /> professional engineer experienced in slope stability to evaluate the issue and determine a solution <br /> 2)Benching may be required on slopes with a vertical height greater than 60 feet if any signs of instability <br /> are observed. See signs of instability in 1 above.The bench should have a horizontal distance of 10 <br /> feet minimum.If the operator is unsure if a bench is needed,it should either be installed or must call <br /> a professional engineer to evaluate the need for the bench <br /> 3)All MSHA rules and regulations must be followed.If any MSHA inspection requires different measures <br /> other than those described herein,they must be followed. <br /> 4)If any material collapses into the safety bench,the last working bench,or the pit bottom that was <br /> unexpected and greater than 1 cubic yard,this event will be reported to an experienced professional <br /> engineer,who will evaluate the cause and determine if changes to the excavation plan are required. <br /> Gloria Z Mine 2013 Amendment 83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.