Laserfiche WebLink
other features represent. A yellow box is shown at the southeast corner of the site; <br /> please indicate if this symbol represents a real feature or if it is an error. <br /> Raptor Materials First Adequacy Response <br /> It was shown at a smaller scale to show the effect on the landform ecology of the <br /> area. A revised 1 inch = 200 scale map with legend is provided. <br /> Division Second Adequacy Comment <br /> The issue with the yellow box was not addressed. Please explain this feature on <br /> the map. Also, please remove the scale in the upper left portion of the map since it <br /> appears to be inaccurate. <br /> Raptor Materials Second Adequacy Response <br /> Exhibit F Map has been revised. The purpose of the yellow box was not understood <br /> and so has been removed. The scale has been corrected. <br /> 39) It appears that the map requires more detail regarding the processing area. Do <br /> the topographical lines on Exhibit F accurately show the post-mining topography? If <br /> not, the map needs to be updated. <br /> Raptor Materials First Adequacy Response <br /> Some minor leveling of this area is anticipated to take place however it is proposed <br /> to regrade with similar direction and slope to approximate original contour as part <br /> of reclamation unless the owner requires otherwise. <br /> Division Second Adequacy Comment <br /> Please add a text box to the map explaining the topographical lines. If they <br /> illustrate pre-mining conditions, this should be stated. <br /> Raptor Materials Second Adequacy Response <br /> Exhibit F Map has been revised with labels indicating the processing area will is at <br /> "Approximate Original Contour". <br /> 40) Per Rule 6.4.6, post-mining land uses should be shown on the map. This is <br /> especially important for the material processing and wash pond areas. <br /> Raptor Materials First Adequacy Response <br /> 421Page <br /> Correspondence to the Colorado Office of Mined Land Reclamation —Reply to Rob Zuber,EPS—Adequacy Letters of 24 June and 5 <br /> August 2022;in the matter of the Two Rivers Sand,Gravel and Reservoir Project—M2022-013. <br />