Laserfiche WebLink
Page 5 <br /> reclamation efforts will begin the following spring. Spring reclamation efforts will encourage adequate <br /> seed germination, ensure water availability, and decrease the chances of short-term soil erosion. <br /> Appropriate grading efforts will be made during mining operations to ensure proper seedbed <br /> preparation and create final topographic contours appropriate for undetermined future land use. <br /> All reclamation shall be carried to completion by the operator with all reasonable diligence,and each <br /> phase of reclamation shall be completed within five(5)years from the date the operator informs the <br /> Board or Office that such phase has commenced,or from the date the Office has evidence that mining <br /> or exploration has ceased,unless extended by the Board or Office. <br /> MONITORING REQUIREMENTS <br /> Pursuant to Rule 3.2(8),"Mining operations shall be inspected a sufficient number of times each year to <br /> ensure compliance with the permit,law,and these Rules.The frequency of inspection shall be <br /> determined by the extent of the operation,rate of mining,degree of actual or potential environmental <br /> impact,and the Operator's past record of compliance." <br /> ANNUAL REPORT & FEES <br /> Pursuant to Rule 1.15,an annual report and an annual fee must be submitted by the anniversary date <br /> of the Notice of Intent(NOI)approval for each year until a reclamation responsibility release is <br /> granted. <br /> 1) The Annual Report shall include all information specified on the Annual Report Form,in the <br /> format required by the Office.The annual report shall contain: <br /> a) Any roads constructed, areas disturbed, and areas reclaimed to date, including <br /> identification of disturbance and reclamation activities which have occurred in the <br /> preceding year.Exploration disturbance and reclamation must be identified on a site map <br /> of adequate scale to field locate these areas,which may include: <br /> (i) Coordinates reported in latitude and longitude in degrees,minutes and seconds or in <br /> decimal degrees to an accuracy of at least five(5)decimal places(e.g.,latitude 37.12345 <br /> N,longitude 104.45678 W);or <br /> (ii) Coordinates based on the Universal Transverse Mercator(UTM)North American <br /> Datum(NAD).For UTM,the Prospector will need to specify NAD 1927,NAD 1983 or <br /> WGS 84,and the applicable zone,measured in meters. <br /> 2) On the anniversary date of the Notice of Intent(NOI)approval,the Person conducting <br /> exploration shall submit to the Office an annual fee as specified in Section 34-32.5-125(b)(ii), <br /> C.R.S. <br /> POST-RECLAMATION INSPECTION & RELEASE OF WARRANTIES <br /> The entirety of each quadrant will be reclaimed pursuant to the Rules. <br /> 1) Pursuant to Rule 3.1.3,all reclamation shall be carried to completion by the operator with all <br /> reasonable diligence,and each phase of reclamation shall be completed within five(5)years <br /> from the date the operator informs the Board or Office that such phase has commenced,or <br />