Laserfiche WebLink
-4- <br /> 12. Primary future(Post-minin land use check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> II Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary present land use(check one : <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> II Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Minn¢: Briefly explain mining method(e.g.truck/shovel): <br /> Dry mining with excavators, loader, and haul trucks to mine the aggregate resource. <br /> 15. On Site Processine: Z Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> A loader will feed aggregate materials into a horizontal impact crusher and aggregate screening plant. <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> N/A <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> Revise reclamation plan from currently approved sealed water storage reservoir to rangeland <br /> after backfill and expand affected area within the permit boundary for surface use disturbances. <br />