My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-01_REVISION - M2015030 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2015030
>
2023-02-01_REVISION - M2015030 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 8:35:08 PM
Creation date
2/2/2023 7:51:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015030
IBM Index Class Name
Revision
Doc Date
2/1/2023
Doc Name Note
REVISED
Doc Name
Request For Amendment To Permit
From
Asphalt Specialties CO
To
DRMS
Type & Sequence
AM2
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chavers Mining Resource <br /> DRMS Permit No.M-2015-030 <br /> Amendment No.2(AM-02) <br /> February 2023 <br /> Page 8 <br /> proceed with the revegetation process. The approximate final contours of the Site are <br /> shown on Exhibit F - Reclamation Plan Map. <br /> ■ Seeding and Growth Monitoring: The topsoil layer will be seeded with a native grass <br /> seed mix to return the property to rangeland use. Growth of the grass will be monitored <br /> quarterly to ensure a successful transition back to rangeland use. <br /> 6.4.5 (2)(b) Land Uses in the Vicinity <br /> Reclamation to rangeland land is a positive and useful post-closure land use that is compatible <br /> with surrounding uses which include multiple sand and gravel mines, oil and gas industry sites, <br /> and other rangeland/agricultural lands. <br /> 6.4.5 (2)(c) Reclamation Performance Standards <br /> The following sections describe how this reclamation plan meets applicable requirements of <br /> Construction Materials Rule No. 3, Section 3.1 Reclamation Performance Standards. <br /> RULE 3: Section 3.1 - Reclamation Performance Standards <br /> 3.1.1 Establish Post Mining Land Use: The post-mining land use shall return the property to <br /> rangeland use. The Site is currently zoned Agricultural by the City of Fort Lupton. <br /> 3.1.2 Reclaiming_Substituted Land: Not Applicable <br /> 3.1.3 Time Limited and Phased Reclamation: A phased reclamation approach will be <br /> implemented. Reclamation will occur in two (2)phases: <br /> ■ Reclamation Phase 1: Backfill—Reclamation Phase 1 will backfill excavated <br /> Cells 2—6 with on-site overburden, crusher fines, wash plant fines, and imported <br /> clean, uncontaminated material. Backfill will occur concurrently with mining <br /> whenever possible;however,backfill will continue after mining is complete. <br /> Reclamation Phase 1 will be complete when backfill of the entire Site is within <br /> approximately 2 - 3 feet of final grade as indicated by ASCI survey. Should <br /> completion of Reclamation Phase 1 not be feasible within five(5) years from the <br /> date ASCI informs the DRMS that all material extraction and stockpile removal is <br /> complete, an extension will be submitted based on the remaining backfill volume <br /> required at that time. <br /> ■ Reclamation Phase 2: Grading, Topsoil, Seeding, and Growth Monitoring—In <br /> Reclamation Phase 2, ASCI will remove existing structures, grade Site contours <br /> for the±87 acres of affected area to approximately six(6)inches below the final <br /> grade, and place a final cover topsoil layer approximately six(6) inches thick <br /> across the affected area. Changes to topography will be made as necessary until the <br /> final grade is within acceptable limits and returned to pre-mining elevations. Once <br /> final grade is achieved, site seeding, fertilizing, and mulching will occur in the <br />
The URL can be used to link to this page
Your browser does not support the video tag.