Laserfiche WebLink
Chavers Mining Resource <br /> DRMS Permit No.M-2015-030 <br /> Amendment No.2(AM-02) <br /> February 2023 <br /> Page ii <br /> TABLE OF CONTENTS <br /> Section Page <br /> INTRODUCTION .........................................................................................................................1 <br /> 6.4.3 EXHIBIT C—PRE-MINING AND MINING PLAN MAP(S) OF AFFECTED <br /> LANDS ............................................................................................................2 <br /> 6.4.4 EXHIBIT D—MINING PLAN............................................................................................3 <br /> 6.4.4(A) DESCRIPTION OF THE METHOD(S) OF MINING.............................................3 <br /> 6.4.4(B) EARTHMOVING.....................................................................................................3 <br /> 6.4.4(C) WATER DIVERSIONS AND IMPOUNDMENTS.................................................3 <br /> 6.4.4(D) SIZE OF AREA(S) TO BE WORKED ON AT ANY ONE TIME .........................4 <br /> 6.4.4 (E)APPROXIMATE TIMETABLE FOR MINING OPERATION...............................4 <br /> 6.4.4 (F) STRATIGRAPHY.....................................................................................................4 <br /> 6.4.4(F)(i)Nature of Deposit........................................................................................4 <br /> 6.4.4(F)(ii)Nature of Stratum beneath Deposit............................................................5 <br /> 6.4.4 (G) COMMODITIES MINED/EXTRACTED AND INTENDED USE........................5 <br /> 6.4.4 (H) INCIDENTAL PRODUCTS MINED/EXTRACTED AND INTENDED USE......5 <br /> 6.4.4(I) EXPLOSIVES............................................................................................................5 <br /> 6.4.4(J) DIMENSIONS OF EXISTING OR PROPOSED ROADS.......................................5 <br /> 6.4.5 EXHIBIT E—RECLAMATION PLAN.............................................................................6 <br /> 6.4.5 (1) PREPARATION OF THE RECLAMATION PLAN..............................................6 <br /> 6.4.5 (2) RECLAMATION PLAN REQUIREMENTS.........................................................6 <br /> 6.4.5 (2)(a) Description of Reclamation Plan................................................................6 <br /> 6.4.5 (2)(b) Land Uses in the Vicinity...........................................................................8 <br /> 6.4.5 (2)(c)Reclamation Performance Standards..........................................................8 <br /> 6.4.5 (2)(d) Revegetation Plan.....................................................................................13 <br /> 6.4.5 (2)(e) Schedule for Implementation....................................................................13 <br /> 6.4.5 (2)(f) Description of Reclamation Details..........................................................14 <br /> 6.4.6 EXHIBIT F—RECLAMATION PLAN MAP................................................................15 <br /> 6.4.7 EXHIBIT G—WATER INFORMATION.......................................................................16 <br /> 6.4.7(1) IF OPERATION IS NOT EXPECTED TO DIRECTLY AFFECT SURFACE OR <br /> GROUNDWATER......................................................................................................16 <br /> 6.4.7(2) IF OPERATION IS EXPECTED TO DIRECTLY AFFECT SURFACE OR <br /> GROUNDWATER......................................................................................................16 <br /> 6.4.7(2)(a) Surface Water and Groundwater Systems Affected by Operation............16 <br /> 6.4.7(2)(b) Known Aquifers ........................................................................................16 <br /> 6.4.7(2)(c) Dewatering Operations and Runoff...........................................................16 <br /> 6.4.7(3) PROJECT WATER REQUIREMENTS................................................................16 <br /> 6.4.7(4) REPLACEMENT WATER SOURCES................................................................16 <br /> 6.4.7(5) NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) <br /> PERMIT.......................................................................................................................17 <br />