Laserfiche WebLink
SOURCE OF LEGAL RIGHT-TO-ENTER EXHIBIT G <br /> See below for the contracted from last project.We will be processing the same contract and will <br /> send to you once it is executed. <br /> BLATTNEF:`� : BORROW AGREEMENT <br /> rhis borrow agreement("Agreement") dated as of LAugust 14,2019_1, ("Effective Date"), by and between <br /> Blattner Energy,Inc.("Blattner"),with an address of 392 County Road 50,Avon,Minnesota 56310,and ICatherine <br /> L Bledsoe Trustee&Robert C Bledsoe Trustee 1 ("Property Owner"),with an address of LBox 435, Hugo <br /> Coloradoj. <br /> The Property Owner represents and warrants it is the legal property owner of the real property listed below <br /> (-Property-)and its mineral rights.Such ownership may include holding legal title to,having a legal interest in,or <br /> being legally authorized under a power of attorney as a legal guardian or as on administrator of on estate to exercise <br /> administrative powers over,but cannot be limited by prohibiting physical changes to the property: <br /> Property: South West Quarter of the South Half Orr SN C%ii o-n 33 <br /> Township: 11 Range: 51 County: Cheyenne State: <br /> CO <br /> The Property Owner hereby agrees to sell and convey exclusively to Blattner earthen material and agrees to permit <br /> Blattner to remove said material that it may determine is suitable for use on the[Bronco Plains,project("Project") <br /> as(choose one or more):(Exclude Top Soil) <br /> p Sand&Gravel Material("Gravel") <br /> ❑ Rock/Aggregate Material("Rock") <br /> ❑ Earthen Material to be used as common or granular borrow("Common Borrow") <br /> 1.TERM.This Agreement begins on the Effective Date and will remain in effect for the following period,or if more <br /> than one option is chosen,until the later to occur: <br /> ❑ Until completion of the Project,including any warranty period <br /> M Until March 31,2020 <br /> 2.QUANTITY.Blattner may take up to[_All that is needed_,]units of earthen material from to the Property to fulfill <br /> its Project requirements.This amount does not establish a maximum or minimum quantity Blattner commits to take <br /> from the Property. The amount set forth above only requires Blattner to obtain consent from the Property Owner <br /> before excavating an amount of earthen material greater than one hundred and thirty percent(130%)of such amount. <br /> Blattner is not obligated to remove any earthen material or pay the Property Owner,until Blattner excavates and <br /> removes earthen material for the Project. <br /> 3.MEASUREMENT.The Payment Quantity will be measured according to the(choose one or more): <br /> ❑ In-place bank cubic yards for: ❑ Gravel ❑ Rock ❑ Common Borrow <br /> p Dry tons for: ® Gravel ❑ Rock ❑ Common Borrow <br /> ❑ Other: for: ❑ Gravel ❑ Rock ❑ Common Borrow <br /> as measured by the(choose one or more): <br /> ❑ Project owner's quantity determination for: ❑ Gravel ❑ Rock ❑ Common Borrow <br /> ❑ Surveyed quantity for: ❑ Gravel ❑ Rock ❑ Common Borrow <br /> ❑ Load count quantity for: ❑ Gravel ❑ Rock ❑ Common Borrow <br /> ❑ Belt scale weight for: ❑ Gravel ❑ Rock ❑ Common Borrow <br /> l 1 Truck load weight for: ❑ Gravel ❑ Rock ❑ Common Borrow <br /> Blattner Energy,Inc.—confidential Document Borrow Agreemont—Page I of 4 LE•12-Cr•0003-RO <br />