Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Reclaim Section 15 Pond,EP3 Stock Pond and Assoc.Ditches <br /> Site: Colowyo Coal Mine Permit Action: TR158 Permit/Job#: C1981019 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 1/26/2023 County: Moffat Filename: C019-000 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Remove and Regrade Stock Pond EP3 EXCAVATE 1 9.16 $1,699 <br /> 002 Regrade Section 15 Pond DOZER 1 33.79 $11,767 <br /> 003 Replace Topsoil for Section 15 Pond(6.3 acre) DOZER 1 16.64 $5,955 <br /> 004 Reseed Section 15 Pond with Grazing Land Seed REVEGE 1 6.00 $3,650 <br /> Mix <br /> 005 Section 15,EP3 Inlet and EP3 Outlet Post-Mining NA 1 301.07 $57,444 <br /> Channels <br /> SUBTOTALS: 366.66 $80,515 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $1,626 <br /> Performance bond: 1.05 Total= $845 <br /> Job superintendent: 183.33 Total= $13,774 <br /> Profit: 10.00 Total= $8,052 <br /> TOTAL O&P= $24,297 <br /> CONTRACT AMOUNT(direct+O&P)= $104,812 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $0 Total= $0 <br /> Engineering work and/or contract/bid preparation: 2.00 Total= $2,096 <br /> Reclamation management and/or administration: 1.91 $2,002 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $28,395 <br /> TOTAL BOND AMOUNT(direct+indirect)= $108,910 <br />