Laserfiche WebLink
Loader Worksheet Cont'd Task#000 Page 2 of 2 <br /> 87.50 SY/HR <br /> Riprap(CY): 0.00 <br /> 7.75 CY/HR <br /> Excavation(CY): 301.07 <br /> 40.00 CY/HR <br /> Total Post-Mining Channel Reconstruction hours: 485.55 Hours <br /> Total Post-Mining Channel Reconstruction Cost: $131,051 <br />