Laserfiche WebLink
16)Please provide an estimate of the actual costs to reclaim the site based on what it would <br /> cost the State of Colorado using an independent contractor to complete reclamation. The <br /> Office adds up to an additional maximum eighteen and one half(18.5%)percent of that <br /> total,which includes a private contract,typical overhead costs and profit. <br /> ri tw:4aJ ptr .3t0.Se, �o /00 x '.ZCQ, S• s� rp14 ..,.., rn„� ,6�i <br /> Direct Cost: <br /> s e-P,*o d i. Backfilling: 4 (cubic yards)X$ _(cost per yard)=Total$ <br /> ii. Grading: (cubic yards)X$ (cost per yard)=Total$ Al <br /> iii. Topsoil: 4 S (cubic yards)X$ 9' (cost per yard)=Total$ S ;2 in <br /> iv. Seeding: (acres)X$ (cost per acre)=Total$ / <br /> v. Mobilization. �^(Pieces of equipment)X$���77��_(cost per equipment)_ <br /> " Total$ �. f,� <br /> Direct Cost Subtotal: $ 3,1 7 D <br /> Division's total overhead cost: X 18.5% <br /> Division's Total cost: $ 3, 7 S� <br /> Note: Based on the Division's experience the required financial warranty is normally set at <br /> approximately$2,500 per acre. Therefore,a typical 5 acre permit will have a total required financial <br /> warranty in the amount of$12,500. <br /> SL-L J tA f Q /o M-A n+ 4 G r ; 4 e M / � -e)e dt <br />