Laserfiche WebLink
COLORADO <br /> 60 <br /> Division of Water Resources <br /> ➢epartment of Naturai Resources <br /> Response to Reclamation Permit Application Consideration <br /> DATE: January 25, 2023 <br /> TO: Nikie C Gagnon, Environmental Protection Specialist <br /> CC: Division 2 Office; District 67 Water Commissioner <br /> FROM: Kate Fuller, P.E. <br /> RE: Colorado Gravel LLC Pit, File No. M-2022-053 <br /> Operator: Colorado Gravel LLC <br /> Contact: Jodi Schreiber, (719) 529-0916 <br /> Sec. 36, Twp. 22S, Rng. 44W, Sixth P.M., Prowers County <br /> CONDITIONS FOR APPROVAL <br /> ® The application materials indicate that a storm water detention structure will be constructed <br /> as a part of this project. The applicant should be aware that, unless the structure can meet <br /> the requirements of a "storm water detention and infiltration facility" as defined in section <br /> 37-92-602(8), Colorado Revised Statutes, the structure may be subject to administration by <br /> this office. The applicant should review DWR's Administrative Statement Regarding the <br /> Management of Storm Water Detention Facilities and Post-Wildland Fire Facilities in Colorado, <br /> attached, to ensure that the notification, construction and operation of the proposed <br /> structure meets statutory and administrative requirements. The applicant is encouraged to <br /> use Colorado Stormwater Detention and Infiltration Facility Notification Portal, located at <br /> https://maperture.digitaldataservices.com/gvh/?viewer=cswdif, to meet the notification <br /> requirements. <br /> ® The proposed operation will consume ground water by: ® evaporation, ® dust control, ❑ <br /> reclamation, ® water removed in the mined product, ❑ processing, ❑ other:. <br /> Prior to initiation of these uses of ground water, the applicant will need to obtain either a <br /> gravel pit or other type of well permit, as applicable. However, prior to obtaining a permit, <br /> an approved substitute water supply plan or decreed plan for augmentation is required. <br /> ® Prior to approving a well permit, the applicant must conduct a field inspection of the site <br /> and document the locations of all wells within 600 feet of the permit area. The applicant <br /> must then obtain a waiver of objection from all well owners with wells within 600 feet of <br /> the permit area or request a hearing before the State Engineer. <br /> ® Other: All water used on-site shall be a legal supply of water provided by an appropriate <br /> supplier. The applicant shall confirm the legality of any proposed source of water supply <br /> with the Division of Water Resources prior to use in the operation. <br /> Off'C01Q� <br /> 1313 Sherman Street, Room 821, Denver, CO 80203 P 303.866.3581 www.colorado.gov/water ye <br /> Jared S. Polis, Governor I Dan Gibbs, Executive Director I Kevin G. Rein, State Engineer/Director * �+ <br /> 'f 1876{` <br />