My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-01-18_GENERAL DOCUMENTS - C1981022
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981022
>
2023-01-18_GENERAL DOCUMENTS - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 9:05:24 AM
Creation date
1/24/2023 9:03:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
General Documents
Doc Date
1/18/2023
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Oxbow Mining OSM and BLM
Type & Sequence
SL7
Permit Index Doc Type
Findings
Email Name
LDS
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 <br /> Elk Creek Mine C-1981-022 Bond Release History <br /> Bond Release Acreage <br /> Total Phase I Phase I Phase II Phase II Phase III Phase III <br /> Disturbed Released Remaining Released Remaining Released Remaining <br /> SL-1 239.2 19.4 219.8 0 239.2 0 239.2 <br /> SL-2 1 239.2 138.74 81.06 72.69 166.51 1 2.33 236.87 <br /> SL-4 239.2 5.7 75.36 5.7 160.81 16.4 220.47 <br /> SL-3 239.2 0 75.36 49.82 110.99 0 220.47 <br /> SL-5 239.2 2.2 73.16 2.2 108.79 31.12 189.35 <br /> SL-6 239.2 0 73.16 35.63 73.16 0 189.35 <br /> SL-7 239.2 0 73.16 0 73.16 21.24 168.11 <br /> The required surety is whichever is greater of(i)the minimum amount of bond to be held based on Rule <br /> 3.03.1(2); and(ii)the estimated cost to reclaim the site. <br /> (i) Table 3 shows the maximum amount of bond eligible for release with SL-7 based on the <br /> acreages in Table 2, but also tracks the minimum total bond that must be held by the Division <br /> based on Rule 3.03.1(2). Based on the figures shown in Table 3,the minimum amount of bond <br /> to be held following the approval of SL-7 is $1,579,960.16. <br /> (ii) The site-wide reclamation cost estimate was last recalculated with MT-8/SR-2 in 2021, and <br /> subsequently adjusted with SL-6. The approval of SL-7 will impact tasks 16, 121 and 122 from <br /> that estimate, as shown in Table 4. Since those tasks were reduced considerably with MT- <br /> 8/SR-2, the dollar amount associated with them is rather small. Although the acreage <br /> associated with task 16 is not exactly the same as that released with SL-7 (20.74 acres <br /> compared to 21.24 acres), they are very close. For the purposes of SL-7 the Division will <br /> subtract the value of task 16 from the estimated cost to reclaim the site calculated with SL-6; <br /> based on this calculation, the estimated remaining cost to reclaim the mine disturbance is <br /> $1,690,969.00, which exceeds the minimum amount of bond to be held from Table 3. <br /> Following the issuance of SL-7 the new required surety for the Elk Creek Mine will be $1,690,969.00 <br /> Any person with a valid legal interest which might be adversely affected by this proposed decision may <br /> request a formal public hearing before the Mined Land Reclamation Board in accordance with Rule <br /> 3.03.2(6). Public notice of this proposed decision will be published twice in the Delta County Independent <br /> as soon as possible. Requests for public hearing must be submitted to the Division in writing within thirty <br /> days of the day following the first publication in the Delta County Independent. If no hearing is requested <br /> within those thirty days,the Division's decision will become final. <br /> C-1981-022,SL-7 Page 8 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.