Laserfiche WebLink
please write "no seal"and re-submit the page. <br /> Response: Please find attached a copy of page 13 with "no seal" written on the page <br /> Structure Aareement <br /> 4. No new structure agreements were provided,please provide a list of structures and the <br /> associated structure agreements. Where the affected lands are within two hundred(200) <br /> feet of any significant, valuable and permanent man-made structure, the applicant shall: <br /> (a)provide a notarized agreement between theApplicant and the Person(s)having <br /> an interest in the structure, that the Applicant is to provide compensation for any <br /> damage to the structure;or <br /> (b) where such an agreement cannot be reached, the Applicant shall provide an <br /> appropriate engineering evaluation that demonstrates that such structure shall <br /> not be damaged by activities occurring at the mining operation;or <br /> (c) where such structure is a utility, the applicant may supply a notarized letter, <br /> on utility letterhead, from the owner(s) of the utility that the mining and <br /> reclamation activities, as proposed, will have "no negative effect"on their utility. <br /> Response: No mining or disturbance has occurred within the permitted area Martin Marietta <br /> requests that the attached Blue Grass Gravel Pit Engineering Evaluation completed by RJH <br /> Consultants, Inc.,dated March 24,2016 remain in effect at this time Martin Marietta agrees to abide <br /> by the recommendations in the evaluation. Following these recommendations will ensure that the <br /> recommended factors of safety will be met or exceeded for surrounding structures This was the <br /> approach taken to approve SO-04 from EWSDI LLC to Southwest Farms on October 28 2021 and the <br /> conditions on site have not changed. <br /> Financial Warranty <br /> 5. If the Permittee and Prospective Successor are in agreement,and choose to maintain their <br /> right to a decision on the application within thirty (30) days, a replacement Financial <br /> Warranty in the amount currently held by the Permittee($20,700)shall be provided by <br /> the Prospective Successor at the time of the application, and is subject to re-calculation <br /> by the Division after issuing its decision on the Application. If the Permittee and <br /> Prospective Successor are in agreement, and choose to waive their right to a <br /> decision on the application within thirty (30) days, the Division will recalculate <br /> the required Financial Warranty before issuing its decision on the Application. <br /> The Financial Warranty requirement will be dependent upon the Permittee's and the <br /> Prospective Successor's answer to item#2 mentioned above in this incompleteness <br /> notice.Please provide the required Financial Warranty reflective of the option chosen by <br /> the Permittee and the Prospective Successor. <br /> Response: Permittee and Prospective Successor agree per revised page 6 of the application <br /> to waive their right to a decision within 30 days. <br />