Laserfiche WebLink
Township 12 South,Range 91 West, 6th PM <br /> Section 27: SWA, S/2SE/4, S/2NE/4SE/4, S/2NW/4SE/4 <br /> Section 28: E/2SE/4 <br /> Section 33: Lots 1,2,3, 6,7, 8, 10, 11, 12, 14, 15, 16, SE/4NWA, S/2NE/4,NEANEA <br /> Section 34: ALL <br /> Section 35: SWA Lot 18,NWA Lot 19 <br /> Township 13 South,Range 92 West, Wh PM <br /> Section 1: SEA <br /> Section 12: lots 1,2,7, 8, 9,and 10 <br /> Revisions to the Permit <br /> Since the Midterm Review was completed by the Division on October 3, 2019, BRL has submitted six <br /> minor revisions and four technical revisions. <br /> Minor Revision No. 201 was received on September 24,2019 and approved and issued on October 2,2019. <br /> The revision updated the hydrology model for a portion of the East Diversion Ditch. <br /> Minor Revision No. 202 was received on October 8, 2019 and approved and issued on October 23, 2019. <br /> The revision updated the Probable Hydrologic Consequences (PHQ for Ponds B and C. <br /> Minor Revision No. 203 was received on January 27, 2020 and approved and issued on April 14, 2020. <br /> The revision entailed miscellaneous responses to the Midterm Review <br /> Minor Revision No. 204 was received on April 15,2021 and approved and issued on April 27, 2021. The <br /> revision updated requirements for the coverfill survey. <br /> Minor Revision No. 205 was received on October 13, 2021 and is in the adequacy process. This revision <br /> proposes an update to ownership and control information. <br /> Minor Revision No. 206 was received on October 13,2021 and approved and issued on October 25, 2021. <br /> The revision changed a culvert to a riprap channel. <br /> Technical Revision No. 120 was received on September 17,2019;approved on October 8,2019; and issued <br /> on October 29,2019. The revision revised the Probable Hydrologic Consequences for Pond D. <br /> Technical Revision No. 121 was received on September 24, 2019; approved on April 16,2020; and issued <br /> on May 5, 2020. The revision reduced the groundwater monitoring frequency. <br /> Technical Revision No. 122 was received on November 18,2020;approved on February 8,2021;and issued <br /> on March 1,2021. The revision changed the design for ditches and an underdrain near Gob Pile No. 3. <br /> Technical Revision No. 123 was received on March 9, 2022 and is currently under review by the Division. <br /> This revision proposes to revise Map 28, which is related to portal seals. <br /> (In the Bowie No. 2 permit materials and in these findings, the terms `gob pile," `waste pile,"and "coal <br /> mine waste bank"are all used. These terms are considered to be interchangeable to the Division for this <br /> site) <br /> 2 <br />