Laserfiche WebLink
100 Rip New CRDA Topsoil Stockpile Access Road; <br /> - M R290 - <br /> 100a Regrade 13LT Outlay Utility Borehole Road Area; <br /> - MR291 - <br /> 100b Rip and Regrade 9 East Utility Borehole Road <br /> - (MR296) - <br /> 101 - Regrade Ditch D-3 <br /> 102 - Regrade Ditch E-1 - <br /> 103 - Regrade Ditch F-1 and Pond F Ditches <br /> 104 Regrade Ditches G-la,G-lb,G-1c,and Million <br /> - Gallon Tank No - <br /> 105 - Regrade Ditch G-4 - <br /> 110 - Backfill and Regrade Pond B <br /> 111 - Backfill and Regrade Pond C <br /> 112 - Backfill and Regrade Pond D <br /> 113 - Backfill and Regrade Pond E <br /> 114 - Backfill and Regrade Pond F <br /> 115 - Backfill and Regrade Pond G <br /> 116 - Backfill and Regrade Pond T - <br /> 117 Backfill and Regrade 6 North Main Holding Pond <br /> - Embankments, - <br /> 118 - Backfill and Regrade 18 Left Vent Shaft Ponds <br /> 120 - Backfill and Regrade Passive Treatment Ponds - <br /> 121 Replace Topsoil on 6 North Main Treatment <br /> - ponds - <br /> 122 Regrade 61VIN Passsive Treatment ponds and inlet <br /> - mod - <br /> 123 - Haul Riprap from 61VIN passive treatment ponds <br /> 130 _ Replace Topsoil at Portal Surface Area <br /> 131 - Replace Topsoil at Off ice/Bathouse <br /> 132 - Replace Topsoil at Parking Lot and Laydown Area - <br /> 133 - Replace Topsoil at Stoker Coal Loading Area <br /> 134 Replace Topsoil at Refuse Area, Refuse Area <br /> - Expansion Phase - <br /> 135 - Replace Topsoil on Haulroad B - <br /> 136 Replace Topsoil on Fish Creek Borehole Area and <br /> - Road - <br /> 137 _ Replace Topsoil on Explosives Storage Area <br /> 138 - Replace Topsoil on Truck Loadout and Haulroad C - <br /> 139 _ Replace Topsoil on Pond E and Haulroad B <br /> 140 - Replace Topsoil on Pond E Relocation Area - <br /> 141 Replace Topsoil on Batch/Weigh Loadout <br /> - Stockpile Area - <br /> 142 Replace Topsoil on 18 Right West Portion Access <br /> - Road - <br /> 143 Replace Topsoil on 18 Right East Central Portion <br /> - Access Road - <br /> 144 Replace Topsoil on 18 Right Northeast Portion <br /> - Access Road - <br /> Foidel Creek Mine RCE Memo January 12,2023 <br />