Laserfiche WebLink
THOMAS GRAVEL PIT #4 RECLAMATION PROJECT <br /> REVISED - Bid Schedule (January 18, 2022) <br /> IFB1, PKAA, #2022.0123 <br /> ITEM DESCRIPTION QTY UNIT UNIT PRICE AMOUNT <br /> 1.0 Mobilize/Demobilize 1 Job NIA $ <br /> � U <br /> 2.0 Develop and Implement Health & Safety 1 Job NIA $ " <br /> Plan + <br /> 3.0 Sediment & Erosion Control 1 Job NIA $ <br /> 4.0 Abandon Existing Piezometer. 1 Job NIA $ qW°' <br /> 5.0 Utility Locate NIA NIA NIA $ NIA <br /> 6.0 North Highwall: Safeguard Highwall and Site 1 Job NIA $ <br /> Grading <br /> 7.0 Northwest Highwall: Safeguard Highwall and 1 Job NIA $ <br /> Site Grading 0 <br /> 8.0 Seeding and Revegetation NIA NIA NIA $ NIA <br /> 8.1 Mine Pit Floor Seeding and Revegetation 6 Acre $ 1 `' lac $ �6 `'� <br /> r <br /> 8.2 Slope Seeding and Revegetation 2 Acre $0 lac $ q.ko, <br /> NOT GUARANTEED—Additional Site Grading C1U U, <br /> 9.0 utilizing Cut& Fill as directed by the Project 100 cy $ 1cY $ `�U <br /> Manager <br /> NOT GUARANTEED—Additional Seed Drilling <br /> 10.0 and Revegetation as directed by the Project 1 Acre $ j lac $ I, <br /> Manager <br /> NOT GUARANTEED— Install additional straw 50 Lf $ /if $ <br /> 11.0 wattle erosion control per specifications if ( � " <br /> required. <br /> 12.0 NOT GUARANTEED—Additional CAT D6 20 Hrs. $ jb�' Ihr $ �7rj`'` <br /> Bulldozer (or equivalent) time if required. <br /> ffff w <br /> GRAND TOTAL (Enter here and on Invitation and Bid Sheet) $ <br /> DO NOT AMEND ANY PART OF THIS BID SCHEDULE <br /> ALL PAGES OF THIS BID SCHEDULE MUST BE RETURNED <br /> ALL LINES ITEMS MUST BE COMPLETED <br /> Page 1 of 1 <br />