My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-15_GENERAL DOCUMENTS - M1981286
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1981286
>
2022-05-15_GENERAL DOCUMENTS - M1981286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2023 6:52:16 AM
Creation date
1/12/2023 10:42:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981286
IBM Index Class Name
General Documents
Doc Date
5/15/2022
Doc Name Note
Thomas Gravel Pit #4
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 30. TAXES <br /> State of Colorado as purchaser is exempt from all Federal taxes under Chapter 32 of the Internal <br /> Revenue Code (Registration No. 84-730123K) and from all State and Local Government Use Taxes <br /> (Ref. Colorado Revised Statutes Chapter 39-26.114(a)). (Our Colorado State and Local Sales Tax <br /> Exemption Number is 98-17835). The Contractor is hereby notified that when materials are <br /> purchased in certain political subdivisions (for example- the City of Denver), the Contractor may <br /> be required to pay sales tax even though the ultimate product or service is provided to the State of <br /> Colorado. This sales tax will not be reimbursed by the State. <br /> Article 31. ROYALTIES AND PATENTS <br /> The CONTRACTOR shall pay all royalties and license fees. He shall defend all suits or claims for <br /> infringement of any patent rights and shall save the State of Colorado harmless from loss on <br /> account thereof. <br /> Article 32. PROJECT PUBLICITY <br /> The Principal Representative will be sole provider of information about the project work to area <br /> residents and special districts, county, state, and federal agencies, and individuals from the media. <br /> Any contact with these groups by the CONTRACTOR must be cleared through the Principal <br /> Representative. <br /> Article 33. TIME OF COMPLETION <br /> It is hereby understood and mutually agreed, by and between the parties hereto, that the date of <br /> beginning, rate of progress and the time for completion of the work to be done hereunder are <br /> Essential Conditions of the Contract; and it is further understood and agreed that the work <br /> embraced in this Contract shall be commenced in the time to be specified in the Notice to Proceed. <br /> It is further agreed that time is of the essence of each and every portion of the Contract and of the <br /> specifications wherein a definite and certain length of time is fixed for the performance of any act <br /> whatsoever; and where under the Contract an additional time is allowed for the completion of any <br /> work, the new time limit fixed by such extension shall also be of the essence of the Contract. <br /> The CONTRACTOR agrees that work will be performed with due diligence in accordance with <br /> accepted engineering and construction practices to the end that the entire contract work shall be <br /> completed within the time specified in the Special Conditions after receipt of the Notice to Proceed. <br /> It is expressly understood and agreed, by and between the parties, that the stipulated performance <br /> time for completion of the work described is a reasonable time for completion of the work, taking <br /> into consideration all factors, including average climatic conditions and usual construction practices <br /> prevailing in the area. <br /> Article 34. TEMPORARY SUSPENSION OF WORK <br /> If the CONTRACTOR is responsible for a delay in progress of the work, the CONTRACTOR shall, <br /> without additional cost, work overtime and use such additional equipment and manpower as may <br /> be necessary to complete the contract work by the stipulated date. Failure to comply will be <br /> grounds for termination of this Agreement as stipulated below or assessment of liquidated <br /> damages as stipulated under TEMPORARY SUSPENSION OF WORK. <br /> The State, acting by and through the Principal Representative, shall have the authority to suspend <br /> the work, either wholly or in part, for such period or periods as he or they may deem necessary due <br /> to: <br /> Colorado Division of Reclamation, Mining and Safety <br /> Page 11 of 21 Pages <br /> Revised: 9/17/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.