Laserfiche WebLink
THOMAS GRAVEL PIT #4 RECLAMATION PROJECT <br /> Bid Schedule <br /> IFB1 , PKAA, 2022 * 0123 <br /> ITEM DESCRIPTION QTY UNIT UNIT PRICE AMOUNT <br /> 1.0 Mobilize/Demobilize 1 Job N/A $ <br /> 2.0 Develop and Implement Health & Safety 1 Job N/A $ <br /> Plan <br /> 3.0 Sediment & Erosion Control 1 Job N/A $ <br /> 4.0 Abandon Existing Piezometer. 1 Job N/A $ <br /> 5.0 Utility Locate N/A N/A N/A $ N/A <br /> 6.0 North Highwall: Safeguard Highwall and Site 1 Job N/A $ <br /> Grading <br /> 7.0 Northwest Highwall: Safeguard Highwall and 1 Job N/A $ <br /> Site Grading <br /> 8.0 Seeding and Revegetation N/A N/A N/A $ N/A <br /> 8.1 Mine pit Floor Seeding and Revegetation 6 Acre $ /ac $ <br /> 8.2 Slope Seeding and Revegetation 2 Acre $ /ac $ <br /> NOT GUARANTEED —Additional Site Grading <br /> 9.0 utilizing Cut & Fill as directed by the Project 100 cy $ /cy $ <br /> Manager <br /> NOT GUARANTEED —Additional Seed Drilling <br /> 10.0 and Revegetation as directed by the Project 1 Acre $ /ac $ <br /> Manager <br /> NOT GUARANTEED — Install additional straw <br /> 11.0 wattle erosion control per specifications if 50 Lf $ /If $ <br /> required. <br /> NOT GUARANTEED —Additional CAT D6 <br /> 12.0 Bulldozer (or equivalent) time if required. 20 Hrs. $ /hr $ <br /> GRAND TOTAL (Enter here and on Invitation and Bid Sheet) $ <br /> DO NOT AMEND ANY PART OF THIS BID SCHEDULE <br /> ALL PAGES OF THIS BID SCHEDULE MUST BE RETURNED <br /> ALL LINES ITEMS MUST BE COMPLETED <br /> Page 1 of 1 <br />