My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-10-28_GENERAL DOCUMENTS - M2007048
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M2007048
>
2022-10-28_GENERAL DOCUMENTS - M2007048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2023 6:51:51 AM
Creation date
1/12/2023 10:34:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007048
IBM Index Class Name
General Documents
Doc Date
10/28/2022
Doc Name Note
Indian Shadows Mine
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All programs, services and activities of the Department of Natural Resources, Division <br /> of Reclamation, Mining and Safety and the Colorado Mined Land Reclamation Board <br /> are operated in compliance with the Americans with Disabilities Act. Details can be <br /> found online at https://dnr.colorado.gov/accessibility. <br /> CORA DISCLOSURE <br /> To the extent not prohibited by federal law, this Contract and the performance measures <br /> and standards under CRS 24-103.5-101, if any, are subject to public release through the <br /> Colorado Open Records Act, CRS 24-72-101, et.seq. <br /> PROJECT WORK DESCRIPTION <br /> The attached General Conditions of the Contract and Purchase Order Terms and <br /> Conditions apply to all work. <br /> ITEM 1.0 MOBILIZATION/DEMOBILIZATION <br /> This item includes those measures necessary and incidental to move equipment and <br /> supplies onto the Project Area, to move equipment within the Project Area, and to <br /> complete any other requirements necessary to accomplish the goals of this Project. This <br /> item also includes all labor, equipment, and costs associated with demobilization and <br /> clean-up of the work site following completion of the Project. Please see Specification <br /> 1.0, Mobilization / Demobilization of the General Bid Specifications, 2009. <br /> CONTRACTOR must comply with the following provisions during performance of this <br /> Project: <br /> No clearing will be conducted without prior approval of the PROJECT MANAGER and <br /> without an approved sediment control structure in place and functional, as required by <br /> PROJECT MANAGER, until construction is completed. Generally, silt fence, installed per <br /> manufacturer's specifications and Section 22.4 of the General Bid Specifications, 2009 is <br /> acceptable as a sediment control measure. <br /> CONTRACTOR will dispose of waste materials, including but not limited to refuse, <br /> garbage, sanitary wastes, spent solvents; oil and other petroleum products off of the <br /> Project Area in accordance with applicable laws and regulations. CONTRACTOR will <br /> specify to PROJECT MANAGER proposed methods for all waste collection and disposal, <br /> modes of waste transport, and waste disposal facilities and locations CONTRACTOR and <br /> subcontractors will use while performing the work, including making any necessary <br /> arrangements for waste collection and disposal. Any fees or charges required to be paid <br /> for collection, transport or disposal of waste materials shall be paid by CONTRACTOR. <br /> At its expense, CONTRACTOR will comply with all applicable federal, state, and local <br /> laws, ordinances, rules and regulations relating to the work, the site, and any materials <br /> and/or equipment provided by CONTRACTOR. <br /> Page 6 of 10 <br /> Rev.7/15/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.