Laserfiche WebLink
Change Order#1 <br /> Will the modified services described in this Change Order begin prior to the execution of a formal <br /> contract amendment? Yes <br /> If"Yes" explain the justification: <br /> The situation is an immediate threat to public health,safety,and/or property,and the process time of <br /> the corresponding contract amendment will result in unacceptable delays and/or significant cost <br /> increases to the Project. <br /> Bid or Description of and Fair& Reasonable Cost Determination for each Cost <br /> New Change Adjustment <br /> Item# <br /> Type of <br /> Modification: Increasing current quantity <br /> Item Name/ <br /> Description <br /> Additional high wall reduction. <br /> During construction it was discovered that <br /> additional areas of high wall around the <br /> 4.0 perimeter of the pond had to be graded to <br /> eradicate tamarisk.Tamarisk is a noxious weed. <br /> Reduce Reason for $3,500 <br /> Highwall Modification: Approximately 350 Lf of additional shoreline will <br /> be graded.The cost for shoreline grading per <br /> the bid is approx. $10 per CY. ($27,300 for 2,650 <br /> Lf. of shoreline) <br /> Basis for Fair& <br /> Reasonable cost Quantity adjustment based on a previously <br /> established rate <br /> determination: <br /> Authorization Page <br /> The Parties hereto agree to the description of the modifications to the Project detailed in this Change <br /> Order Form. Persons signing on behalf of the Contractor hereby swear and affirm that they are duly <br /> authorized to act on the Contractor's behalf and acknowledge that the State is relying on their <br /> representations to that effect. In accordance with §24-30-202 C.R.S., the State can make no payments <br /> for the modified services described in this Change Order until the execution of an amendment to the <br /> contract that is signed and dated by the State Controller or an authorized delegate. <br /> CONTRACTOR— STATE— <br /> Project Manager/ Rep sentative Project Manager/ Representative <br /> DigitallysignedbyJulieAnnear <br /> Julie DN:cn=Julie Annear,o=Division <br /> of Reclamation,Mining and <br /> Safaty,ni-DNR <br /> Sture Signature email=julie.annear@state.co.us, <br /> us <br /> c=o h n Vi"a I I e j'6s Annear Date:2022.09.08 06:13:56 <br /> Printed Name Printed Name <br /> Page 2 of 3 <br />