Laserfiche WebLink
PROJECT NAME Mining Property,Highway 263 PROJECT NUMBER 22.3050 A/�\ A /� <br /> BORING LOCATION See Figure 2 BORING ELEVATION ��/ V V <br /> DRILLING COMPANY/RIG Dakota Drilling/CME-55 CMTTS REP. J.Edwards <br /> DRILLING METHOD Tin. Diameter HSA DATE STARTED 9/8/2022 <br /> HAMMER SYSTEM Automatic Hammer DATE COMPLETED 9/8/2022 Page 3 of 3 <br /> SAMPLE <br /> ■0 <br /> p p m g ELEVATION(ft) MATERIAL DESCRIPTION DEPTH(ft) WELL DIAGRAM <br /> 72 <br /> CLAYSrONE,moist,gray. '• <br /> 75 <br /> 79 <br /> Boring terminated at 79 feet <br /> LEGEND <br /> i WATER LEVEL AT TIME OF DRILLING ®BULK SAMPLE <br /> Q_# WATER LEVEL#DAYS AFTER DRILLING <br /> —i# DEPTH OF CAVE#DAYS AFTER DRILLING CMT <br /> sue, INC' TE <br /> r TECHNICAL <br /> DEPTH OF REFUSAL rK,�a..rc.c ,�c..�.a,.r. c.. $ E R v i c E s <br />