Laserfiche WebLink
GWS-31 <br /> OZ/2017 <br /> INSTRUCTIONS FOR WELL CONSTRUCTION AND YIELD ESTIMATE REPORT <br /> This report must be computer generated online,typed or printed in BLACK OR BLUE INK and may be reproduced by photocopy or computer generation. <br /> Photocopy reproductions must retain margins and print quality. Attach additional sheets if more space is required. Each additional sheet must be identified <br /> at the top by the well owner's name,the permit number,form name/number and a sequential page number, Report depths in feet below ground surface. <br /> If filing online please see the Form Submittal,Payment Options,ft Fee Schedule.You may also save,print and email the completed form to: <br /> dwryermitsonline@state.co.us <br /> The form must be submitted to the State Engineer's Office within 60 days after completing the well or 7 days after the permit expiration date, <br /> whichever is earlier. A copy of the form must be provided to the well owner. <br /> Item Instructions:(numbers correspond with those on the front of this form) <br /> 1. Complete the well permit and receipt number. <br /> 2. Provide the Identification(owner's well designation)for the well. <br /> 3. Fill in well owner name. <br /> 4. Provide the street address where the well is located. <br /> 5. Provide the GPS location where the well was drilled(required field). <br /> Colorado contains two(2)UTM zones. Zone 13 covers most of Colorado. The boundary between Zone 12 and Zone 13 is the 108a'Meridian(longitude). <br /> West of the 1081h Meridian is UTM Zone 12 and east of the 108`"Meridian is UTM Zone 13. The 1081 Meridian is approximately 57 miles east of the <br /> Colorado-Utah state line. On most GPS units,the UTM zone is given as part of the Easting measurement,e.g. 12TO123456. Check the appropriate <br /> box for the zone. <br /> 6. Complete the legal description location of the well and county, For wells located in subdivisions,the name,lot,block,and filing,must be provided. <br /> 7. Report the ground surface elevation in feet above sea level if available. This value may be obtained from a topographic map. Provide the date the <br /> well was completed and describe the drilling method used to construct the well. <br /> 8. Indicate the aquifer in which the well was completed,the total depth drilled,and the actual completed depth of the well. <br /> 9. Indicate whether or not the well inspection team was required to be notified prior to construction. If required,provide the date notification was given. <br /> See https://dwr.cotorado,gov/services/welt-construction-inspection for more information on Notifications. <br /> 10. Check the box indicating the type aquifer in which the welt is completed(See Rule 5.2.2 Well Construction Rules). <br /> 11. Fully describe the materials encountered in drilling. Do not use formation names unless they are in conjunction with a description of materials. Examples <br /> of descriptive terms include: <br /> Type-sandstone,sand,etc. <br /> Grain size-Boulders,gravel,sand,silt,clay,etc. <br /> Color-Denote for all materials,most critical in sedimentary rock <br /> Water Location-Depth where water is encountered(if it can be determined) <br /> 12. Provide the diameters of the drilled borehole. <br /> 13. The outside diameter, type,wall thickness,and interval of plain and perforated casing lengths must be indicated. For perforated casing,the screen <br /> size must be indicated. <br /> 14. Indicate the material and size of filter pack(e.g.sand.gravel.etc.)and the interval where placed. <br /> 15. Indicate the type and setting depth for any packers installed. <br /> 16. The material,amount,and interval of the grout slurry must be reported. Density may be indicated as pounds per gallon,gallons of water per sack, <br /> total gallons of water used,or number of sacks used,etc. Specify the grout placement method,i.e.tremle pipe or positive placement. The percentage <br /> of additives mixed with the grout should be reported under remarks. <br /> 17. Record the type and the amount of disinfection used,how placed,and the length of time left in the hole. <br /> 18. Report Well Yield Estimate data as required by Rule 17.1.1. Spaces are provided to report all estimates made during the assessment. The report should <br /> show that the estimate comptied with the provisions of the rules. If available,report clock time when measurements were taken. If an estimate was <br /> not performed,explain when it will be done. A full Welt Yield Test may be performed instead of an estimate; if so,check the appropriate box and <br /> submit the data on form GWS39. <br /> 19. Fill in Company Name,Email,and Address and License Number(or PE/PG)of the Individual who is responsible for the welt construction. The licensed <br /> contractor or authorized individual responsible for the construction of the well must sign or if filing online,enter his/her name on the report. If filing <br /> online the State Engineer considers the entering of the licensed contractors name on the form to be a certification of accuracy and truthfulness in <br /> compliance with Rule 17.4 of the Water Well Construction Rules and Regulations,2 CCR 402-2. <br /> Rule 17.4 Certification • Work reports must be signed and certified as to accuracy and truthfulness of the information on the report by the welt <br /> construction or pump Installation contractors or authorized individuals responsible for the work performed by them or under their direction or <br /> supervision,or by the private driller or private pump installer if the work was performed by them. Such reports are deemed to be completed,signed <br /> and certified under oath. <br /> Submit completed report to:State of Colorado,Office of the State Engineer, 1313 Sherman St,Room 821,Denver,CO 80203. You may also save,print,scan <br /> and email the completed form to dwrpermitsonline@state.co.us <br /> IF YOU HAVE ANY QUESTIONS regarding any item on this form,please call the Division of Water Resources Ground Water Information Desk(303-866-3587),or <br /> the nearest Division of Water Resources Field Office located in Greeley(970-352-8712),Pueblo(719.542-3368),Atamosa(719.589-6683),Montrose <br /> (970-249.6622),Glenwood Springs(970.945.5665),Steamboat Springs(970-879.0272),or Durango(970-247.1845),or refer to our web site at dwr.colorado.eov <br /> for general information,forms,online filing instructions and access to state rules and statutes. <br />