My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-01-10_PERMIT FILE - M2023001 (12)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2023001
>
2023-01-10_PERMIT FILE - M2023001 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 9:26:39 PM
Creation date
1/11/2023 3:10:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2023001
IBM Index Class Name
Permit File
Doc Date
1/10/2023
Doc Name Note
Exhibit G - Water Information
Doc Name
Application
From
J-2 Contracting Company
To
DRMS
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RCVD DWR <br /> GWS-51 NOTICE OF INTENT TO CONSTRUCT MONITORING HOLE(S) 08/30/2022 <br /> 02/2017 Please type or print legibly in black or blue ink or file online,dwrpermitsonline@state.co.us <br /> State of Colorado,Office of the State Engineer 1313 Sherman St,Room 821, <br /> Denver,CO 80203 Phone 303-866-3581 www.water.state.co.us <br /> Well Owner Name(s): <br /> Sunset Industrial, LLC. Location: Section 3 <br /> Address: 1050 Coronado Ct, Unit A-101, Ft. Collins, 80525 Township 5 MN QS,Range 65 pE QW, 6 PM <br /> Phone; (970)219-3916 County: Weld <br /> Email: Subdivision: n/a <br /> Lot: Block: Filing: <br /> Landowner's Name.. Sunset Industrial, LLC. Site/Property Address Highway 263. Greeley <br /> Please check one and complete as indicated including contact info: <br /> GPS Location in UTM format if known: <br /> ❑Water Well Driller Licensed In Colorado-Lic.No. Set GPS unit to true north,datum NAD83,and use meters for <br /> ❑Professional Engineer Registered in Colorado-Reg. No. the distance units,(3Zone 12 or OZone 13. <br /> 0 Professional Geologist per C.R.S.23-41-208(b) Easting 529454 Northing 4475088 <br /> 0 Other — anyone directly employed by or under the supervision of a licensed #of Monitoring Holes to be constructed in Section: 5 <br /> driller,registered professional engineer or professional geologist Estimated Depth 80 Ft.,Aquifer n/a <br /> Contact/Company Jay Edwards / Cesare, Inc. <br /> Address 7108 S.Alton Way, Bldg B Purpose of Monitoring Holes) Groundwater <br /> City,State a zip Centennial CO 80112 Monitoring <br /> Phone (303)220-0300 <br /> Email jedwards@cesareinc.com Anticipated Date of Construction: 09/08/2022 <br /> Print Name:Jay Edwards <br /> Date Notice Submitted: 08/30/2022 <br /> Signature or enter full name here: 1sY B. Edwards (Must be at least 3 days prior to construction) <br /> ACKNOWLEDGEMENT FROM STATE ENGINEER'S OFFICE <br /> FOR OFFICE USE ONLY <br /> 63811 MH PROCESSED BY <br /> Div. 1 WD—3 BAs MD DATE ACKNOWLEDGED 08131/2022 <br /> CONDITIONS OF MONITORING HOLE ACKNOWLEDGEMENT <br /> A COPY OF THE WRITTEN NOTICE OR ACKNOWLEDGEMENT SHALL BE AVAILABLE AT THE DRILLING SITE. <br /> 1) Notice was provided to the State Engineer at least 72 hours prior to construction of monitoring Et observation hole(s). <br /> 2) Construction of the hole(s)must be completed within 90 days of the date notice was given to the State Engineer. Testing and/or <br /> pumping shall not exceed a total of 200 hours unless prior written approval is obtained from the State Engineer. Water diverted during <br /> testing must not be used for beneficial purposes. The owner of the hole(s)is responsible for obtaining permit(s)and complying with all rules <br /> and regulations pertaining to the discharge of fluids produced during testing. <br /> 3) All work must comply with the Water Well Construction Rules,2 CCR 402-2. Standard permit application and work report forms are <br /> found of the DWR website at http://www.water.state.co.us. Well Construction and Yield Estimate Reports(GWS-31)must be <br /> completed for each hole drilled. The licensed coitractor or authorized individual must submit the completed forms to this office within 60 <br /> days of monitoring hole completion. Aquifer testing information must be submitted on Well Yield Test Report(GWS-39). <br /> 4) Unless a well permit Is obtained or variance approved,the hole(s)must be plugged and sealed within eighteen(18)months after <br /> construction. An Abandonment Report(GWS-09)must be submitted within 60 days of plugging&sealing. The above MH <br /> acknowledgement number,owner's structure name,and owners name and address must be provided on all well permit application(s),well <br /> construction and abandonment reports. <br /> 5) A MONITORING HOLE CANNOT BE CONVERTED TO A PRODUCTION WATER WELL,except for purposes of remediation(recovery)or as a <br /> permanent dewatering system,if constructed in accordance with the Water Well Construction Rules and policies of the State Engineer. <br /> 6) IF HOLES WILL NOT BE CONSTRUCTED UNDER THIS NOTICE WITHIN 90 DAYS,PLEASE WRITE"NO HOLES CONSTRUCTED"ON A COPY OF <br /> THE ACKNOWLEDGED NOTICE WiTH THE FILE NUMBER AND EMAIL TO THE DIVISION OF WATER RESOURCES AT <br /> DWRpermitsontine@state.co.us. <br /> THIS ACKNOWLEDGEMENT OF NOTICE DOES NOT INDICATE THAT WELL PERMIT(S)CAN BE APPROVED. <br /> Incomplete forms or Notice provided less than 72 hours prior to well construction wit(not be acknowledged <br />
The URL can be used to link to this page
Your browser does not support the video tag.