Laserfiche WebLink
PROJECT NAME Mining Property,Highway 263 PROJECT NUMBER 22.3050 A/�\ A /� <br /> BORING LOCATION See Figure 2 BORING ELEVATION ��/ V V <br /> DRILLING COMPANY/RIG Dakota Drilling/CME-55 CMTTS REP. J. Edwards <br /> DRILLING METHOD 7in.Diameter HSA DATE STARTED 9/8/2022 <br /> HAMMER SYSTEM Automatic Hammer DATE COMPLETED 9/8/2022 Page 3 of 3 <br /> SAMPLE <br /> Z <br /> AY <br /> �q <br /> (p� 1 <br /> J �0 <br /> S <br /> a 30 <br /> G G m B ELEVATION(R) MATERIAL DESCRIPTION DEPTH(R) WELL DIAGRAM <br /> i• <br /> 72 <br /> CLAYSTONE,moist,gray. <br /> 75 <br /> 79 <br /> Boring terminated at 79 feet <br /> LEGEND <br /> i WATER LEVEL AT TIME OF DRILLING ®BULK SAMPLE <br /> Q_# WATER LEVEL#DAYS AFTER DRILLING <br /> —►# DEPTH OF CAVE#DAYS AFTER DRILLING <br /> &SARE, . TECHNICAL <br /> Cm T <br /> INC <br /> 1 DEPTH OF REFUSAL INC a E R v ( c 9 8 <br />