Laserfiche WebLink
PRO3ECT NAME Mining Property,Highway 263 PROJECT NUMBER 22.3050 n/�\n/� <br /> BORING LOCATION See Figure 2 BORING ELEVATION I Y I V V J <br /> DRILLING COMPANY/RIG Dakota Drilling/CME-55 CMTTS REP. 3. Edwards <br /> DRILLING METHOD 7in. Diameter HSA DATE STARTED 9/8/2022 <br /> HAMMER SYSTEM Automatic Hammer DATE COMPLETED 9/8/2022 Page 1 of 3 <br /> SAMPLE <br /> 8� <br /> (f Ayy O <br /> � J►O <br /> C u ?2 i <br /> p p m ELEVATION(R) MATERIAL DESCRIPTION DEPTH(R) WELL DIAGRAM <br /> SAND,silty to clayey,with fine gravels less than 1",slightly moist,brown. 'Concrete Cap <br /> with 2.5' <br /> z Steel Stickup <br /> CLAY,sandy,with fine gravel less than 1",moist,brown. <br /> — 5 <br /> 5 <br /> SAND,with day,with gravel,moist,brown. <br /> 10 <br /> -Bentonite <br /> 11 <br /> CLAY,sandy,with fine gravel less than 1",moist,brown. <br /> 14.5 -2"S40 PVC <br /> 15 SAND,gravelly,locally with clay,occasional day lenses,gravels typically 1"to 2",occasional 3"to Riser <br /> 4"estimated,moist to wet,brown. <br /> 20 <br /> -10/20 <br /> Washed Silica <br /> 25 Sand <br /> .Z <br /> 30 <br /> i� • <br /> ti i — <br /> i '2"S40 PVC <br /> •'i •'2 .01"Slotted <br /> Screen <br /> LEGEND <br /> i WATER LEVEL AT TIME OF DRILLING ®BULK SAMPLE <br /> Q# WATER LEVEL#DAYS AFTER DRILLINGrTlr-= <br /> rmT <br /> —i# DEPTH OF CAVE#DAYS AFTER DRILLING `� • i • <br /> 1 OSARE, INC. TECHNICAL <br /> DEPTH OF REFUSAL c...�.«rr .acwc, , s E R V I c 1 • <br />