Laserfiche WebLink
PROJECT NAME Mining Property,Highway 263 PROJECT NUMBER 22.3050 n/�\A/� <br /> BORING LOCATION See Figure 2 BORING ELEVATION I Y I V V <br /> DRILLING COMPANY/RIG Dakota Drilling/CME-55 CMTTS REP. J.Edwards <br /> DRILLING METHOD 7in.Diameter HSA DATE STARTED 9/12/2022 <br /> HAMMER SYSTEM Automatic Hammer DATE COMPLETED 9/12/2022 Page 1 of 4 <br /> SAMPLE <br /> Np <br /> ELEVATION(R) MATERIAL DESCRIPTION DEPTH(R) WELL DIAGRAM <br /> SAND,with fine gravels less than 1",with clay to with silt,moist,brown. -Concrete Cap <br /> with 2.5' <br /> Steel Stickup <br /> 5 <br /> -Bentornte <br /> 9 <br /> SAND and GRAVEL,1"to 2"gravels,occasional 3"to 4"estimated,moist to wet,brown. <br /> 10 .'p. <br /> a <br /> .q.. <br /> .'p. -2"S40 PVC <br /> t►•� Riser <br /> 'C: <br /> A'• <br /> 15 'Ct'. J• <br /> •Ci.; -10/20 <br /> Washed Silica <br /> .�. Sand <br /> �.� .� -Native <br /> sand/gravel <br /> .'Q. cave-in <br /> 4• sandpack to <br /> Cl•; 21' <br /> 25 '�•� <br /> 30 <br /> 34 <br /> SAND,gravelly,1"to 2"gravels,occasional 3"estimated,wet,brown. <br /> LEGEND <br /> i WATER LEVEL AT TIME OF DRILLING Is BULK SAMPLE <br /> Q_# WATER LEVEL#DAYS AFTER DRILLING m STANDARD PENETRATION TEST <br /> —+# DEPTH OF CAVE#DAYS AFTER DRILLING <br /> mr <br /> NkSARE, <br /> r INC., TECHNICAL <br /> DEPTH OF REFUSAL s E R V I e E 5 <br />