My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-01-10_PERMIT FILE - M2023001 (9)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2023001
>
2023-01-10_PERMIT FILE - M2023001 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 9:55:39 PM
Creation date
1/11/2023 3:04:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2023001
IBM Index Class Name
Permit File
Doc Date
1/10/2023
Doc Name Note
Exhibit D - Mining Plan
Doc Name
Application
From
J-2 Contracting Company
To
DRMS
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
650,000 tons per year. The initial production is expected to be 300,00 tons per year with the <br /> maximum production expected to be 1,000,000 tons per year. However, it is possible that due to <br /> demand fluctuations, mining could progress slower than anticipated and additional time may be <br /> required for mining and reclamation of the site. <br /> The operator is proposing to mine Phase 1 first. Phase 1 is 64.22 acres and the estimated time <br /> for mining Phase 1 is approximately 9 years and 6 months.. <br /> The operator is proposing to mine Phase 2 second as the area is currently being permitted as <br /> an RV storage site so this area will not be mined until after Phase 1. During the mining Phase 2 <br /> a slurry wall will be installed around the perimeter of Phase 2 prior to exposing groundwater. <br /> Phase 2 is 20.95 acres. The estimated time for mining Phase 2 is approximately 2 years and 6 <br /> months. <br /> The mining will progress in each phase beginning at the outer edge of the phase where material <br /> will be moved toward the interior of the phase such that the mining slope can be established. <br /> The mining slope will be established for the entire perimeter of the phase in 3 to 6 feet intervals. <br /> Dewatering <br /> Dewatering trenches will be placed along the perimeter of each mining area in Phases 1 and 2. <br /> The dewatering trench around the perimeter of the phase being mined will be placed at the toe <br /> of the mining slope. As the phase is mined deeper the dewatering trench will be lowered and <br /> moved laterally along the mining slope toward the center of that phase. Slurry walls are <br /> anticipated to be installed around the perimeter of Phases 1 and 2 prior to exposing <br /> groundwater and mining will continue to commence in those phases and it is expected minimal <br /> dewatering will be required after the slurry walls are installed due to the slurry walls cutting off <br /> groundwater infiltration into the pit. J-2 Contracting Company will have an approved substitute <br /> water supply plan and well permit prior to exposing groundwater. The substitute supply plan will <br /> be updated annually to account for water that is consumed due to exposing groundwater by the <br /> mining operation. <br /> Explosives <br /> Explosives will not be used during mining. <br /> � J&T Consulting,Inc. J-2 Contracting Company' Sunset Industrial Pit <br /> DRMS 112 Permit Application <br />