Laserfiche WebLink
0 <br /> CD <br /> CV <br /> O O <br /> �; <br /> Ll -�.5 O <br /> O <br /> L L (0, <br /> X Q� U <br /> (n� O � <br /> 11) O L <br /> Lo <br /> 00 O <br /> �i <br /> C� rn <br /> m <br /> in <br /> c <br /> 0 <br /> h <br /> T <br /> H <br /> T <br /> m <br /> Q <br /> M <br /> O <br /> M <br /> N SR <br /> 0 <br /> APPROXIMATE <br /> FINISHED GRADE <br /> :3 FURROWS 2" TO 4" DEEP <br /> a PARALLEL TO CONTOURS <br /> 6" MIN. TOPSOIL U <br /> LAYER, TYP. <br /> N <br /> O � <br /> (� <br /> SURFACE ROUGHENING INSTALLATION NOTES i <br /> 0 <br /> 1. SURFACE ROUGHENING SHALL BE PROVIDED ON ALL FINISHED <br /> GRADES (SLOPES AND "FLAT" AREAS) WITHIN 2 DAYS OF = a_ <br /> COMPLETION OF FINISHED GRADE (FOR AREAS NOT RECEIVING _ (D <br /> TOPSOIL) OR WITHIN 2 DAYS OF TOPSOIL PLACEMENT. y= <br /> r 2. AREAS WHERE BUILDING FOUNDATIONS, PAVEMENT, OR SOD IS <br /> TO BE PLACED WITHIN 7—DAYS OF FINISHED GRADING DO NOT <br /> a NEED TO BE SURFACE ROUGHENED. a <br /> a a � <br /> 2 3. DISTURBED SURFACES SHALL BE ROUGHENED USING RIPPING OR N N 2.; <br /> TILLING EQUIPMENT ON THE CONTOUR OR TRACKING UP ANDDOWN A SLOPE USING EQUIPMENT TREADS. ao <br /> SURFACE ROUGHENING MAINTENANCE NOTES <br /> 1. THE SWMP MANAGER SHALL INSPECT THE SURFACE ROUGHENING �o H OTHE <br /> E WEEKLY, DURING AND AFTER ANY STORM EVENT AND MAKE ,_ _ _ I,, ) m <br /> REPAIRS OR CLEAN OUT UPSTREAM SEDIMENT AS NECESSARY. « ,co_ o z <br /> EARTH—SAVERS o E m .. <br /> 0 2. VEHICLES AND EQUIPMENT SHALL GENERALLY BE CONFINED TO STRAW WATTLE <br /> i ACCESS DRIVES AND SHALL NOT BE DRIVEN OVER AREAS THAT ` GROUND <br /> HAVE BEEN SURFACE ROUGHENED. FLOW M <br /> o <br /> 3. IN NON—TURF GRASS FINISHED AREAS, SEEDING AND MULCHING Job No. 2019-341.002 <br /> SHALL TAKE PLACE DIRECTLY OVER SURFACE ROUGHENED AREAS f ` -Drawn by RPF 2 <br /> n WITHOUT FIRST SMOOTHING OUT THE SURFACE. T i �, / Date: 01/04/2023 <br /> Q e: ABF o RiflePit-Details <br /> 0 4. IN AREAS NOT SEEDED AND MULCHED AFTER SURFACE v N <br /> i ROUGHENING, SURFACES SHALL BE RE-ROUGHENED AS ENCH Title <br /> Q1 NECESSARY TO MAINTAIN GROOVE DEPTH AND SMOOTH OVER <br /> ANY RILL EROSION. Erosion Control Details <br /> N <br /> U <br /> 0J <br /> SURFACE ROUGHENING ON STRAW WATTLE Dwg No. <br /> C FINISHED GRADES H INSTALLATION ,� 0 <br /> O N.T.S. I O N.T.S. <br /> N <br /> Of 13 <br />