13.0 Exhibit L — Reclamation Costs <br /> Reclamation details are provided in Figure 14, Exhibit E1 and Figure 15, Exhibit E2. The <br /> pond will not be backfilled but will remain as open water. A 6-foot wide 5:1 wetland slope will <br /> be constructed on the inner perimeter of the pond, transitioning to 3:1 slope to full depth. <br /> Reclamation costs are also associated with reclamation activities on the perimeter berm, the <br /> 25-foot-wide upland buffer on the outside of the perimeter berm, and the reclamation of the <br /> Operations Area. Volumes, areas, and seeding mixes are provided in Figure 15, Exhibit <br /> E2. <br /> • Backfill of the pond to create the 0.70 acres of wetland reclamation area, utilizing <br /> approximately 566 CY of salvaged fill and topsoil, at a cost of$3/CY = $1,698 total. <br /> • Seeding and Planting of the 0.70 acres of wetland reclamation area with the Wetland <br /> Seeding and Planting Mix, at a cost of$10,000/ac = $7,000 total. <br /> • Construction of perimeter berms on 2.87 acres, utilizing approximately 11,303 CY of <br /> salvaged fill at a cost of$3/CY = $33,909 total. <br /> • Replace 2,221 CY of salvaged topsoil on the perimeter berms at a cost of$3/CY = <br /> $6,663 total. <br /> • Seeding and erosion control on the 2.87 acres of perimeter berms, using the Upland <br /> Seeding and Planting Mix, at a cost of$1000/ac= $2,870 total. <br /> Based on these costs, and a 28% DRMS cost factor, the total bond for the Rifle Gravel Pit <br /> will be $66,060.80 <br /> Table 7. Reclamation Costs <br /> Activity Description Time Months cost $ <br /> Backfill of pond to create wetland fringe 1 1,168 <br /> Seeding & Planting of wetland fringe 1 7,000 <br /> Construction of perimeter berms .25 33,909 <br /> Surfacing of perimeter berms with topsoil 1 6,663 <br /> Seeding of berms with upland seed mix 1 2,870 <br /> Sub-Total .65 51,610 <br /> DRMS Costs 14,450.80 <br /> 28% x direct costs <br /> Total Bond Amount $66,060.80 <br /> 67 <br />