Laserfiche WebLink
piri�' t71 aV?i Pi #1 Jarl-iary )1_)23 <br /> 7.0 Exhibit F — Reclamation Plan Map <br /> Figure 11, Exhibit C6, Figure 14, Exhibit E1 and Figure 15, Exhibit E2 include <br /> information required per Rule 6.4.6. Figure 9, Figure 10, and Figure 11 (Exhibits C4, C5, <br /> and C6, respectively) depict phases of the total scope of the mining operation, including the <br /> expected physical appearance of the Affected Lands, correlated to the proposed mining and <br /> reclamation timetables. These maps also show the proposed topography of the area with <br /> contour lines of sufficient detail to portray the direction and rate of slope of all reclaimed <br /> lands and the proposed final land use for each portion of the Affected Lands. The location of <br /> the pond is also depicted in Figure 14, Exhibit E1 (estimated at approximately 9.55 acres in <br /> size). <br /> 45 <br />