Pifie Grave! R ;t; January 2023 <br /> Size of Area Worked <br /> The size of area involved with this Phase is 19.00 acres. <br /> Equipment <br /> This phase will use conventional earth moving equipment to grade, remove vegetation and <br /> stockpile topsoil, including but not limited to a bulldozer, track-hoe, and a 35-ton haul truck. <br /> 5.2.2.2 Water Diversions and Impoundments <br /> No water diversions or additional low water crossing work will be required as part of Phase <br /> 2. Scott will install the required Spill Prevention, Control, and Countermeasure secondary <br /> containment during Phase 2 as needed. <br /> 5.2.2.3 Water Handling, Dewatering, and Permits <br /> Scott will continue to work on acquiring the necessary permits and approvals initiated during <br /> Phase 1 during Phase 2, as needed. <br /> 5.2.3 Mining Extraction (Phase 3) <br /> Phase 3 includes the mining extraction operations for the 10.43 acres (of the 19.00 acres of <br /> Affected Lands). This section describes the mining methods, earthmoving, and size of the <br /> areas anticipated to be mined at the 30%, 60%, and 100% mining development of the 10.43 <br /> acres over three to five years. <br /> Size of Area Worked at 30% <br /> The estimated area to be mined at 30% is approximately 4.78 acres (depicted in Figure 9, <br /> Exhibit C4) and amounts to approximately 88,000 CY of mined material. <br /> Size of Area Worked at 60% <br /> The estimated area to be mined at 60% is approximately 6.83 acres (depicted in Figure 10, <br /> Exhibit C5) and amounts to approximately 140,000 cumulative CY of mined material. <br /> Size of Area Worked at 100% <br /> The estimated area to be mined at 100% is approximately 10.43 acres (depicted in Figure <br /> 11, Exhibit C6) and amounts to approximately 292,810 cumulative CY of mined material. <br /> Equipment <br /> This phase will use conventional mining equipment for this phase, including but not limited <br /> to a long-reach excavator, a bulldozer, track-hoe, screening plant, wash plant, crusher, and <br /> a 35-ton haul truck. <br /> 5.2.3.1 Mining Methods and Earthmoving <br /> This phase of the project will include mining, stockpiling of material for screening, washing <br /> and crushing processes. <br /> • The working surface of the mine will consist of the alluvial gravel surface that is <br /> exposed after removal of the overburden. A long-reach excavator stationed on the <br /> edge of the pit will excavate material to a depth of approximately 20 feet. The pit will <br /> fill with water as excavation proceeds, forming a pond that expands as the excavator <br /> 30 <br />