Laserfiche WebLink
44.Individual agreements for each Owner must be signed by the Operator and <br /> Structure(s) Owner. A blanket statement cannot be submitted in lieu of a <br /> completed agreement. Where an agreement cannot be reached an engineering <br /> evaluation may be submitted (Exhibit 6.5 Geotechnical Stability analysis) per <br /> Rule 6.4.19(b). <br /> A copy of the signed Structures Agreement is included in Attachment B of the <br /> DBMS Permit Application document. <br /> 45.URSA Operating Company, LLC (if successor identify company) - Gas, steam, <br /> and non-potable water <br /> Scott retained a geotechnicat engineer to produce a geotechnical stability report. <br /> See Attachment C of the DRMS Permit Application document. <br /> If you have any questions or need additional information, please feel free to contact <br /> me directly at churley@ihcscott.com or 720-490-7407. <br /> Sincerely, <br /> IHC SCOTT, IN <br /> r <br /> s Hurley <br /> Corporate Counsel <br />